X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244230211002

Well Details

Well ID: 0244230211002
Loading map...
Location: 00/11-02-024-23W4/2
Location Alias: 00/11-02-24-23 W4M
Location Alias 2: 00/11-02-024-23 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 02
County/Municipality: Wheatland County
Well Name: PCP 11B CAVALIER 11-2-24-23
Operator Name: Lynx Energy ULC
License Number: 0189935
License Date: 1996-07-25
License Status: Issued
Spud Date: 1996-09-27
Final Drill Date: 1996-10-06
Well Total Depth: 1597.00 m
Surface Hole Latitude: 51.019103
Surface Hole Longitude: -113.113739

For data sources see[1][2]

Well History

Date Event
1996-07-25 Obtained License
1996-09-27 Well Log Performed
1996-09-28 Surface Casing Operation Performed
1996-10-01 Direction Drilling Operation Performed - Deviate
1996-10-06 Finished Drilling
1996-10-06 Well Log Performed
1996-10-06 Well Mode changed to Drilled and Cased
1996-10-07 Production Casing Operation Performed
1996-10-07 Rig Released
1996-10-16 Well Log Performed
1996-10-22 Well Log Performed
1996-11-18 Perforation Treatment Performed - Jet Perforation
2000-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-11 Plug Back Performed
2000-07-11 Well Log Performed
2000-08-22 Well Log Performed
2000-09-18 Perforation Treatment Performed - Jet Perforation
2000-09-18 Well Mode changed to Drilled and Cased
2000-10-03 Perforation Treatment Performed - Jet Perforation
2006-03-05 Perforation Treatment Performed - Jet Perforation
2006-03-05 Well Log Performed
2006-03-09 Perforation Treatment Performed - Fractured
2006-03-10 Well Fluid changed to Gas
2006-03-10 Well Mode changed to Testing
2006-03-14 Well Began Production
2006-03-14 Well Fluid changed to Gas
2006-03-14 Well Mode changed to Flowing
2009-09-08 Perforation Treatment Performed - Jet Perforation
2009-09-09 Well Fluid changed to Coalbed Methane-Coals and Other
2009-09-09 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-10-01 926.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-11-18 Perforation 1552.50 1554.50 20
2009-09-08 Perforation 427.90 428.90 13
2009-09-08 Perforation 382.60 383.60 13
2009-09-08 Perforation 294.20 295.20 13
2009-09-08 Perforation 291.20 294.20 13
2009-09-08 Perforation 267.80 268.80 13
2009-09-08 Perforation 266.40 267.40 13
2009-09-08 Perforation 262.60 263.60 13
2009-09-08 Perforation 257.10 258.10 13
2009-09-08 Perforation 251.00 252.00 13
2009-09-08 Perforation 248.30 249.30 13
2000-07-11 Packing Device Capped w/Cement 1537.00 1545.00 0
2009-09-08 Perforation 241.30 242.30 13
2009-09-08 Perforation 233.30 234.30 13
2009-09-08 Perforation 221.50 222.50 13
2000-09-18 Perforation 728.00 731.00 7
2000-10-03 Perforation 658.00 660.00 7
2006-03-05 Perforation 615.00 619.00 17
2006-03-09 Fracture 728.00 731.00 0
2006-03-09 Fracture 658.00 660.00 0
2006-03-09 Fracture 615.00 619.00 0
2009-09-08 Perforation 708.20 709.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7289 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8527 0.0 0.0 0.0
2010 8702 0.0 0.0 0.0
2011 8699 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8709 0.0 0.0 0.0
2014 8683 0.0 0.0 0.0
2015 8627 0.0 0.0 0.0
2016 8729 0.0 0.0 0.0
2017 8695 0.0 0.0 0.0
2018 8718 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References