X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244223501002

Well Details

Well ID: 0244223501002
Loading map...
Location: 00/01-35-024-22W4/2
Location Alias: 00/01-35-24-22 W4M
Location Alias 2: 00/01-35-024-22 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 22
Section: 35
County/Municipality: Wheatland County
Well Name: PCP HUSSAR 1-35-24-22
Operator Name: Lynx Energy ULC
License Number: 0213393
License Date: 1998-02-12
License Status: Issued
Spud Date: 1998-06-09
Final Drill Date: 1998-06-23
Well Total Depth: 893.00 m
Surface Hole Latitude: 51.081982
Surface Hole Longitude: -112.959210

For data sources see[1][2]

Well History

Date Event
1998-02-12 Obtained License
1998-06-09 Conductor Casing Operation Performed
1998-06-23 Finished Drilling
1998-06-23 Well Mode changed to Drilled and Cased
1998-06-24 Production Casing Operation Performed
1998-06-24 Rig Released
1998-07-15 Well Log Performed
1998-08-26 Perforation Treatment Performed - Jet Perforation
1998-09-05 Perforation Treatment Performed - Fractured
1998-09-08 Perforation Treatment Performed - Jet Perforation
1998-09-12 Perforation Treatment Performed - Fractured
1998-09-17 Perforation Treatment Performed - Jet Perforation
2000-09-19 Perforation Treatment Performed - Fractured
2010-05-22 Perforation Treatment Performed - Jet Perforation
2010-06-24 Perforation Treatment Performed - Fractured
2010-06-30 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-08-26 Perforation 858.00 861.00 7
2010-05-22 Perforation 544.00 548.00 13
2010-06-24 Fracture 623.00 626.00 0
2010-06-24 Fracture 611.00 613.00 0
2010-06-24 Fracture 565.00 568.50 0
2010-06-24 Fracture 544.00 548.00 0
1998-09-05 Fracture 858.00 861.00 0
1998-09-08 Perforation 775.00 778.00 7
1998-09-12 Fracture 775.00 778.00 0
1998-09-17 Perforation 592.50 595.50 7
2000-09-19 Fracture 592.50 595.50 0
2010-05-22 Perforation 623.00 626.00 13
2010-05-22 Perforation 611.00 613.00 13
2010-05-22 Perforation 565.00 568.50 13

For data sources see[4]



References