X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244222406002

Well Details

Well ID: 0244222406002
Loading map...
Location: 00/06-24-024-22W4/2
Location Alias: 00/06-24-24-22 W4M
Location Alias 2: 00/06-24-024-22 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 22
Section: 24
County/Municipality: Wheatland County
Well Name: PCP HUSSAR 6-24-24-22
Operator Name: Lynx Energy ULC
License Number: 0074935
License Date: 1979-03-15
License Status: Abandoned
Spud Date: 1979-06-20
Final Drill Date: 1979-06-27
Well Total Depth: 1510.00 m
Surface Hole Latitude: 51.059169
Surface Hole Longitude: -112.947618

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-15 Obtained License
1979-06-27 Finished Drilling
1979-06-27 Well Log Performed
1979-06-27 Well Mode changed to Drilled and Cased
1979-06-28 Drill Stem Test Performed
1979-06-29 Drill Stem Test Performed
1979-06-30 Production Casing Operation Performed
1979-09-18 Perforation Treatment Performed - Jet Perforation
1979-09-19 Perforation Treatment Performed - Jet Perforation
1994-01-06 Well Log Performed
1994-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-07 Plug Back Performed
1994-01-14 Perforation Treatment Performed - Jet Perforation
1994-01-14 Well Log Performed
1994-02-26 Perforation Treatment Performed - Fractured
1995-02-01 Well Fluid changed to Gas
1995-02-01 Well Mode changed to Testing
1995-07-15 Perforation Treatment Performed - Jet Perforation
1995-07-17 Perforation Treatment Performed - Fractured
1995-09-05 Well Began Production
1995-09-05 Well Fluid changed to Gas
1995-09-05 Well Mode changed to Flowing
1996-05-15 Well Log Performed
1996-06-01 Perforation Treatment Performed - Cement Squeeze
1996-06-01 Plug Back Performed
1996-06-01 Well Log Performed
1996-06-03 Well Log Performed
1996-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-04 Perforation Treatment Performed - Cement Squeeze
1996-06-04 Well Fluid changed to Gas
1996-06-04 Well Mode changed to Abandoned Zone
1996-06-05 Plug Back Performed
1996-06-08 Perforation Treatment Performed - Jet Perforation
1996-06-08 Well Log Performed
1996-06-09 Perforation Treatment Performed - Jet Perforation
1996-06-12 Perforation Treatment Performed - Fractured
2000-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-28 Plug Back Performed
2000-04-29 Perforation Treatment Performed - Jet Perforation
2000-04-29 Well Log Performed
2000-10-31 Perforation Treatment Performed - Fractured
2003-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-16 Plug Back Performed
2003-10-23 Perforation Treatment Performed - Jet Perforation
2009-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-12 Perforation Treatment Performed - Cement Squeeze
2009-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-18 Well Log Performed
2009-08-19 Perforation Treatment Performed - Cement Squeeze
2009-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-21 Plug Back Performed
2009-08-21 Well Log Performed
2009-09-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-18 Perforation 1428.00 1429.50 6
1996-06-01 Cement Squeeze 507.00 515.00 0
1996-06-04 Acid Treatment 668.00 673.00 0
1996-06-04 Cement Squeeze 668.00 673.00 0
1996-06-08 Perforation 1428.00 1429.50 6
1996-06-08 Perforation 1431.00 1433.50 6
1996-06-09 Perforation 1428.00 1429.50 20
1996-06-09 Perforation 1431.00 1433.50 20
1996-06-12 Fracture 1428.00 1433.50 0
2000-04-28 Packing Device Capped w/Cement 1413.00 1423.00 0
2000-04-29 Perforation 1224.00 1227.00 20
1979-09-18 Perforation 1431.00 1433.50 6
2000-10-31 Fracture 1224.00 1227.00 0
2003-10-16 Packing Device Capped w/Cement 1192.00 1200.00 0
2003-10-23 Perforation 388.20 389.20 13
2003-10-23 Perforation 380.20 381.20 13
2003-10-23 Perforation 376.30 377.30 13
2003-10-23 Perforation 373.00 374.00 13
2003-10-23 Perforation 371.10 372.10 13
2003-10-23 Perforation 321.20 322.20 13
2003-10-23 Perforation 202.60 203.60 13
2003-10-23 Perforation 199.10 200.10 13
1979-09-19 Perforation 1428.00 1429.50 6
2009-08-12 Cement Squeeze 371.00 389.20 0
2009-08-12 Packing Device Capped w/Cement 361.00 369.00 0
2009-08-18 Packing Device Capped w/Cement 310.00 318.00 0
2009-08-19 Cement Squeeze 199.10 203.60 0
2009-08-21 Packing Device Capped w/Cement 186.50 194.50 0
1979-09-19 Perforation 1431.00 1433.50 6
1994-01-07 Packing Device Capped w/Cement 1407.00 1415.00 0
1994-01-14 Perforation 668.00 673.00 7
1994-02-26 Fracture 668.00 673.00 0
1995-07-15 Perforation 507.00 515.00 6
1995-07-17 Fracture 507.00 515.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 494 0.0 0.0 0.0
1996 298 0.0 0.0 0.0

For data sources see[5]

References