X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244222112002

Well Details

Well ID: 0244222112002
Loading map...
Location: 00/12-21-024-22W4/2
Location Alias: 00/12-21-24-22 W4M
Location Alias 2: 00/12-21-024-22 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 22
Section: 21
County/Municipality: Wheatland County
Well Name: ECA ECR HUSSAR 12-21-24-22
Operator Name: Lynx Energy ULC
License Number: 0270543
License Date: 2002-06-03
License Status: Issued
Spud Date: 2002-06-23
Final Drill Date: 2002-07-02
Well Total Depth: 1648.50 m
Surface Hole Latitude: 51.062627
Surface Hole Longitude: -113.029259

For data sources see[1][2]

Well History

Date Event
2002-06-03 Obtained License
2002-06-23 Surface Casing Operation Performed
2002-06-29 Direction Drilling Operation Performed - Deviate
2002-07-02 Finished Drilling
2002-07-02 Well Log Performed
2002-07-02 Well Mode changed to Drilled and Cased
2002-07-03 Production Casing Operation Performed
2002-07-03 Rig Released
2002-07-28 Perforation Treatment Performed - Jet Perforation
2002-07-28 Well Log Performed
2005-09-28 Well Log Performed
2005-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-03 Perforation Treatment Performed - Jet Perforation
2005-10-03 Plug Back Performed
2005-10-03 Well Log Performed
2005-10-09 Perforation Treatment Performed - Jet Perforation
2005-10-09 Well Log Performed
2005-10-25 Perforation Treatment Performed - Fractured
2005-11-04 Well Began Production
2005-11-04 Well Fluid changed to Gas
2005-11-04 Well Mode changed to Flowing
2008-02-02 Well Log Performed
2008-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-04 Perforation Treatment Performed - Jet Perforation
2008-02-04 Plug Back Performed
2008-02-04 Well Fluid changed to Gas
2008-02-04 Well Mode changed to Abandoned Zone
2008-02-10 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-06-29 748.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-28 Perforation 1577.00 1578.00 17
2008-02-04 Perforation 413.80 414.80 13
2008-02-04 Perforation 411.90 412.90 13
2008-02-04 Perforation 369.90 371.90 13
2008-02-04 Perforation 271.00 273.00 13
2008-02-04 Perforation 249.30 250.30 13
2008-02-04 Perforation 240.10 241.10 13
2008-02-04 Perforation 229.00 231.00 13
2008-02-04 Perforation 225.90 226.90 13
2008-02-04 Perforation 222.40 223.40 13
2008-02-10 Fracture 222.90 418.20 0
2005-10-03 Packing Device Capped w/Cement 1566.00 1574.00 0
2005-10-03 Perforation 603.50 604.50 13
2005-10-03 Perforation 601.00 602.00 13
2005-10-09 Perforation 567.00 568.50 14
2005-10-09 Perforation 547.00 550.00 14
2005-10-25 Fracture 547.00 568.50 0
2008-02-04 Packing Device Capped w/Cement 532.00 540.00 0
2008-02-04 Perforation 417.20 418.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 492 0.0 0.0 0.0

For data sources see[6]

References