X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244221804000

Well Details

Well ID: 0244221804000
Loading map...
Location: 00/04-18-024-22W4/0
Location Alias: 00/04-18-24-22 W4M
Location Alias 2: 00/04-18-024-22 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 22
Section: 18
County/Municipality: Wheatland County
Well Name: PCP PCR HUSSAR 4-18-24-22
Operator Name: Lynx Energy ULC
License Number: 0248542
License Date: 2001-01-08
License Status: Issued
Spud Date: 2001-03-05
Final Drill Date: 2001-03-07
Well Total Depth: 938.00 m
Surface Hole Latitude: 51.040575
Surface Hole Longitude: -113.073346

For data sources see[1][2]

Well History

Date Event
2001-01-08 Obtained License
2001-03-05 Surface Casing Operation Performed
2001-03-07 Finished Drilling
2001-03-07 Production Casing Operation Performed
2001-03-07 Rig Released
2001-03-07 Well Mode changed to Drilled and Cased
2001-03-12 Well Log Performed
2001-03-21 Perforation Treatment Performed - Jet Perforation
2001-03-23 Perforation Treatment Performed - Jet Perforation
2002-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-30 Plug Back Performed
2002-11-30 Well Mode changed to Abandoned Zone
2002-12-02 Perforation Treatment Performed - Jet Perforation
2002-12-07 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-21 Perforation 655.00 657.00 7
2002-12-02 Perforation 289.80 290.80 13
2002-12-02 Perforation 286.20 288.20 13
2002-12-02 Perforation 265.20 266.20 13
2002-12-02 Perforation 263.00 264.00 13
2002-12-02 Perforation 259.50 260.50 13
2002-12-02 Perforation 258.30 259.30 13
2002-12-02 Perforation 253.70 255.70 13
2002-12-02 Perforation 247.20 248.20 13
2002-12-02 Perforation 244.10 245.10 13
2002-12-02 Perforation 238.70 239.70 13
2001-03-23 Perforation 614.00 616.00 7
2002-12-02 Perforation 190.00 191.00 13
2002-12-07 Fracture 190.00 428.10 0
2002-11-30 Packing Device Capped w/Cement 642.00 650.00 0
2002-11-30 Packing Device Capped w/Cement 602.00 610.00 0
2002-12-02 Perforation 427.10 428.10 13
2002-12-02 Perforation 424.00 425.00 13
2002-12-02 Perforation 422.20 423.20 13
2002-12-02 Perforation 382.70 384.70 13
2002-12-02 Perforation 341.40 342.40 13

For data sources see[4]



References