If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244200706002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.030097,"lon":-112.7893,"icon":""}]} |
Location: 00/06-07-024-20W4/2 | |
Location Alias: 00/06-07-24-20 W4M | |
Location Alias 2: 00/06-07-024-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 20 | |
Section: 07 | |
County/Municipality: Wheatland County | |
Well Name: PCP HUSSAR 6-7-24-20 | |
Operator Name: Lynx Energy ULC | |
License Number: 0063403 | |
License Date: 1977-04-05 | |
License Status: Suspension | |
Spud Date: 1977-06-02 | |
Final Drill Date: 1977-06-07 | |
Well Total Depth: 1447.80 m | |
Surface Hole Latitude: 51.030097 | |
Surface Hole Longitude: -112.789300 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-04-05 | Obtained License |
1977-06-07 | Finished Drilling |
1977-06-07 | Well Mode changed to Drilled and Cased |
1977-06-08 | Drill Stem Test Performed |
1977-06-09 | Drill Stem Test Performed |
1977-06-10 | Production Casing Operation Performed |
1977-10-07 | Perforation Treatment Performed - Jet Perforation |
1977-10-13 | Perforation Treatment Performed - Fractured |
1994-01-09 | Well Log Performed |
1994-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-01-19 | Perforation Treatment Performed - Jet Perforation |
1994-01-19 | Plug Back Performed |
1994-01-19 | Well Log Performed |
1994-02-27 | Perforation Treatment Performed - Fractured |
1994-08-13 | Well Began Production |
1994-08-13 | Well Fluid changed to Gas |
1994-08-13 | Well Mode changed to Flowing |
1995-01-09 | Perforation Treatment Performed - Jet Perforation |
1995-01-11 | Perforation Treatment Performed - Fractured |
1995-06-27 | Well Fluid changed to Gas |
1995-06-27 | Well Mode changed to Flowing |
2003-10-27 | Well Log Performed |
2003-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-10-28 | Plug Back Performed |
2003-10-28 | Well Fluid changed to Gas |
2003-10-28 | Well Mode changed to Abandoned Zone |
2004-01-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2004-01-09 | Perforation Treatment Performed - Remedial Casing |
2004-01-11 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2004-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-01-12 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-10-07 | Perforation | 784.60 | 787.60 | 7 |
1995-01-11 | Fracture | 576.00 | 582.00 | 0 |
2003-10-28 | Packing Device Capped w/Cement | 592.00 | 600.00 | 0 |
2003-10-28 | Packing Device Capped w/Cement | 562.00 | 570.00 | 0 |
2004-01-08 | Hydra Jet Perforation | 216.00 | 220.00 | 1 |
2004-01-09 | Remedial Casing Cementing | 216.00 | 220.00 | 0 |
2004-01-11 | Hydra Jet Perforation | 188.00 | 192.00 | 1 |
2004-01-12 | Remedial Casing Cementing | 188.00 | 192.00 | 0 |
2004-01-12 | Packing Device Capped w/Cement | 181.00 | 187.00 | 0 |
1977-10-13 | Fracture | 784.60 | 787.60 | 0 |
1994-01-19 | Packing Device Capped w/Cement | 772.00 | 780.00 | 0 |
1994-01-19 | Perforation | 609.00 | 611.40 | 13 |
1994-01-19 | Perforation | 612.60 | 615.70 | 13 |
1994-01-19 | Perforation | 616.30 | 619.90 | 13 |
1994-02-27 | Fracture | 609.00 | 619.90 | 0 |
1995-01-09 | Perforation | 576.00 | 578.00 | 6 |
1995-01-09 | Perforation | 579.00 | 582.00 | 6 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 3280 | 0.0 | 0.0 | 0.0 |
1995 | 5489 | 0.0 | 0.0 | 0.0 |
1996 | 8648 | 0.0 | 0.0 | 0.0 |
1997 | 8533 | 0.0 | 0.0 | 0.0 |
1998 | 8666 | 0.0 | 0.0 | 0.0 |
1999 | 8683 | 0.0 | 0.0 | 0.0 |
2000 | 8597 | 0.0 | 0.0 | 0.0 |
2001 | 8652 | 0.0 | 0.0 | 0.0 |
2002 | 8244 | 0.0 | 0.0 | 0.0 |
2003 | 6926 | 0.0 | 0.0 | 0.0 |
For data sources see[5]