X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244200706002

Well Details

Well ID: 0244200706002
Loading map...
Location: 00/06-07-024-20W4/2
Location Alias: 00/06-07-24-20 W4M
Location Alias 2: 00/06-07-024-20 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 20
Section: 07
County/Municipality: Wheatland County
Well Name: PCP HUSSAR 6-7-24-20
Operator Name: Lynx Energy ULC
License Number: 0063403
License Date: 1977-04-05
License Status: Suspension
Spud Date: 1977-06-02
Final Drill Date: 1977-06-07
Well Total Depth: 1447.80 m
Surface Hole Latitude: 51.030097
Surface Hole Longitude: -112.789300

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-04-05 Obtained License
1977-06-07 Finished Drilling
1977-06-07 Well Mode changed to Drilled and Cased
1977-06-08 Drill Stem Test Performed
1977-06-09 Drill Stem Test Performed
1977-06-10 Production Casing Operation Performed
1977-10-07 Perforation Treatment Performed - Jet Perforation
1977-10-13 Perforation Treatment Performed - Fractured
1994-01-09 Well Log Performed
1994-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-19 Perforation Treatment Performed - Jet Perforation
1994-01-19 Plug Back Performed
1994-01-19 Well Log Performed
1994-02-27 Perforation Treatment Performed - Fractured
1994-08-13 Well Began Production
1994-08-13 Well Fluid changed to Gas
1994-08-13 Well Mode changed to Flowing
1995-01-09 Perforation Treatment Performed - Jet Perforation
1995-01-11 Perforation Treatment Performed - Fractured
1995-06-27 Well Fluid changed to Gas
1995-06-27 Well Mode changed to Flowing
2003-10-27 Well Log Performed
2003-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-28 Plug Back Performed
2003-10-28 Well Fluid changed to Gas
2003-10-28 Well Mode changed to Abandoned Zone
2004-01-08 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-01-09 Perforation Treatment Performed - Remedial Casing
2004-01-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-12 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-07 Perforation 784.60 787.60 7
1995-01-11 Fracture 576.00 582.00 0
2003-10-28 Packing Device Capped w/Cement 592.00 600.00 0
2003-10-28 Packing Device Capped w/Cement 562.00 570.00 0
2004-01-08 Hydra Jet Perforation 216.00 220.00 1
2004-01-09 Remedial Casing Cementing 216.00 220.00 0
2004-01-11 Hydra Jet Perforation 188.00 192.00 1
2004-01-12 Remedial Casing Cementing 188.00 192.00 0
2004-01-12 Packing Device Capped w/Cement 181.00 187.00 0
1977-10-13 Fracture 784.60 787.60 0
1994-01-19 Packing Device Capped w/Cement 772.00 780.00 0
1994-01-19 Perforation 609.00 611.40 13
1994-01-19 Perforation 612.60 615.70 13
1994-01-19 Perforation 616.30 619.90 13
1994-02-27 Fracture 609.00 619.90 0
1995-01-09 Perforation 576.00 578.00 6
1995-01-09 Perforation 579.00 582.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3280 0.0 0.0 0.0
1995 5489 0.0 0.0 0.0
1996 8648 0.0 0.0 0.0
1997 8533 0.0 0.0 0.0
1998 8666 0.0 0.0 0.0
1999 8683 0.0 0.0 0.0
2000 8597 0.0 0.0 0.0
2001 8652 0.0 0.0 0.0
2002 8244 0.0 0.0 0.0
2003 6926 0.0 0.0 0.0

For data sources see[5]

References