If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244133616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.095467,"lon":-111.684629,"icon":""}]} |
Location: 00/16-36-024-13W4/0 | |
Location Alias: 00/16-36-24-13 W4M | |
Location Alias 2: 00/16-36-024-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 13 | |
Section: 36 | |
County/Municipality: Special Areas No. 2 | |
Well Name: AMOCO CESSFORD 16-36-24-13 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0056020 | |
License Date: 1975-12-01 | |
License Status: RecCertified | |
Spud Date: 1975-12-02 | |
Final Drill Date: 1975-12-08 | |
Well Total Depth: 1019.60 m | |
Surface Hole Latitude: 51.095467 | |
Surface Hole Longitude: -111.684629 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-12-01 | Obtained License |
1975-12-02 | Lost Circulation Occurred |
1975-12-02 | Production Casing Operation Performed |
1975-12-08 | Finished Drilling |
1975-12-08 | Well Mode changed to Drilled and Cased |
1975-12-10 | Drill Stem Test Performed |
1975-12-11 | Drill Stem Test Performed |
1976-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-02-02 | Perforation Treatment Performed - Jet Perforation |
1976-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-03-15 | Perforation Treatment Performed - Jet Perforation |
1976-03-23 | Well Began Production |
1976-03-23 | Well Fluid changed to Crude Oil |
1976-03-23 | Well Mode changed to Pumping |
1976-04-19 | Well Fluid changed to Crude Oil |
1976-04-19 | Well Mode changed to Suspended |
1996-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-05 | Plug Back Performed |
1996-09-07 | Well Abandoned |
1996-09-07 | Well Fluid changed to Crude Oil |
1996-09-07 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-02-02 | Perforation | 1005.20 | 1007.10 | 7 |
1976-02-02 | Acid Treatment | 1005.20 | 1007.10 | 0 |
1976-03-15 | Packing Device Capped w/Cement | 1004.30 | 1004.30 | 0 |
1976-03-15 | Perforation | 998.50 | 1001.00 | 13 |
1976-03-15 | Acid Treatment | 998.50 | 1001.00 | 0 |
1996-09-05 | Packing Device Capped w/Cement | 976.00 | 984.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 550 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1975-12-02 | Lost Circulation | 7.60 | 23.00 |
For data sources see[6]