If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244120912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.032284,"lon":-111.631813,"icon":""}]} |
Location: 00/12-09-024-12W4/0 | |
Location Alias: 00/12-09-24-12 W4M | |
Location Alias 2: 00/12-09-024-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 12 | |
Section: 09 | |
County/Municipality: Special Areas No. 2 | |
Well Name: RENAISSANCE CESSFORD 12-9-24-12 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0152391 | |
License Date: 1992-05-05 | |
License Status: Abandoned | |
Spud Date: 1992-06-04 | |
Final Drill Date: 1992-06-07 | |
Well Total Depth: 920.00 m | |
Surface Hole Latitude: 51.032284 | |
Surface Hole Longitude: -111.631813 |
Date | Event |
---|---|
1992-05-05 | Obtained License |
1992-06-05 | Surface Casing Operation Performed |
1992-06-07 | Finished Drilling |
1992-06-07 | Production Casing Operation Performed |
1992-06-07 | Well Log Performed |
1992-06-07 | Well Mode changed to Drilled and Cased |
1992-06-08 | Rig Released |
1992-06-12 | Perforation Treatment Performed - Jet Perforation |
1992-06-17 | Perforation Treatment Performed - Fractured |
1992-06-20 | Well Began Production |
1992-06-20 | Well Fluid changed to Crude Oil |
1992-06-20 | Well Mode changed to Pumping |
1992-11-30 | Well Fluid changed to Crude Oil |
1992-11-30 | Well Mode changed to Suspended |
1994-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-02-09 | Plug Back Performed |
1994-02-09 | Well Abandoned |
1994-02-09 | Well Fluid changed to Crude Oil |
1994-02-09 | Well Mode changed to Abandoned |
2009-10-03 | Well Log Performed |
2009-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-04 | Perforation Treatment Performed - Jet Perforation |
2009-10-04 | Plug Back Performed |
2009-10-06 | Perforation Treatment Performed - Jet Perforation |
2009-10-06 | Well Log Performed |
2009-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-09 | Plug Back Performed |
2010-08-31 | Well Log Performed |
2010-09-22 | Perforation Treatment Performed - Jet Perforation |
2010-09-24 | Perforation Treatment Performed - Jet Perforation |
2010-09-27 | Perforation Treatment Performed - Jet Perforation |
2010-09-28 | Perforation Treatment Performed - Remedial Casing |
2010-09-30 | Well Log Performed |
2010-10-02 | Perforation Treatment Performed - Jet Perforation |
2010-10-02 | Well Log Performed |
2010-10-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-03 | Perforation Treatment Performed - Remedial Casing |
2010-10-03 | Plug Back Performed |
2010-10-06 | Perforation Treatment Performed - Jet Perforation |
2010-10-06 | Well Log Performed |
2010-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-07 | Perforation Treatment Performed - Remedial Casing |
2010-10-07 | Plug Back Performed |
2010-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-12 | Perforation Treatment Performed - Jet Perforation |
2010-10-12 | Perforation Treatment Performed - Remedial Casing |
2010-10-12 | Plug Back Performed |
2010-10-12 | Well Log Performed |
2010-10-13 | Perforation Treatment Performed - Jet Perforation |
2010-10-13 | Well Log Performed |
2010-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-14 | Perforation Treatment Performed - Remedial Casing |
2010-10-14 | Plug Back Performed |
2010-10-15 | Well Log Performed |
2011-11-17 | Well Log Performed |
2011-11-18 | Perforation Treatment Performed - Jet Perforation |
2011-11-22 | Perforation Treatment Performed - Remedial Casing |
2011-11-30 | Well Log Performed |
2011-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-12-01 | Well Log Performed |
2011-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-06-12 | Perforation | 897.50 | 902.00 | 13 |
2010-09-27 | Perforation | 897.50 | 902.00 | 13 |
2010-09-28 | Remedial Casing Cementing | 897.50 | 902.00 | 0 |
2010-10-02 | Perforation | 805.50 | 807.50 | 20 |
2010-10-03 | Remedial Casing Cementing | 805.50 | 807.50 | 0 |
2010-10-03 | Packing Device Capped w/Cement | 784.80 | 801.20 | 0 |
2010-10-06 | Perforation | 488.00 | 490.00 | 22 |
2010-10-07 | Remedial Casing Cementing | 488.00 | 490.00 | 0 |
2010-10-07 | Packing Device Capped w/Cement | 468.00 | 484.70 | 0 |
2010-10-12 | Perforation | 420.00 | 422.00 | 20 |
2010-10-12 | Remedial Casing Cementing | 420.00 | 422.00 | 0 |
1992-06-17 | Fracture | 897.50 | 902.00 | 0 |
2010-10-12 | Packing Device Capped w/Cement | 396.20 | 410.50 | 0 |
2010-10-13 | Perforation | 343.00 | 345.00 | 20 |
2010-10-13 | Perforation | 338.00 | 340.00 | 17 |
2010-10-14 | Remedial Casing Cementing | 338.00 | 345.00 | 0 |
2010-10-14 | Packing Device Capped w/Cement | 325.00 | 335.20 | 0 |
2011-11-18 | Perforation | 185.00 | 188.00 | 13 |
2011-11-22 | Remedial Casing Cementing | 185.00 | 188.00 | 0 |
2011-12-01 | Packing Device Capped w/Cement | 174.00 | 182.00 | 0 |
2011-12-04 | Packing Device Capped w/Cement | 20.00 | 25.50 | 0 |
1994-02-09 | Packing Device Capped w/Cement | 884.00 | 892.00 | 0 |
2009-10-04 | Perforation | 491.00 | 493.00 | 13 |
2009-10-04 | Packing Device Capped w/Cement | 469.70 | 506.00 | 0 |
2009-10-06 | Perforation | 341.00 | 343.00 | 13 |
2009-10-09 | Packing Device Capped w/Cement | 264.40 | 359.00 | 0 |
2010-09-22 | Perforation | 341.00 | 343.00 | 13 |
2010-09-24 | Perforation | 491.00 | 493.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 236 | 0.0 | 0.0 | 0.0 |
For data sources see[5]