X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244050115000

Well Details

Well ID: 0244050115000
Loading map...
Location: 00/15-01-024-05W4/0
Location Alias: 00/15-01-24-05 W4M
Location Alias 2: 00/15-01-024-05 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 05
Section: 01
County/Municipality: Special Areas No. 3
Well Name: SLE ALKALI 15-1-24-5
Operator Name: SanLing Energy Ltd.
License Number: 0221220
License Date: 1999-02-04
License Status: Abandoned
Spud Date: 1999-02-17
Final Drill Date: 1999-02-21
Well Total Depth: 1005.00 m
Surface Hole Latitude: 51.021876
Surface Hole Longitude: -110.574026

For data sources see[1][2]

Well History

Date Event
1999-02-04 Obtained License
1999-02-18 Surface Casing Operation Performed
1999-02-20 Well Log Performed
1999-02-21 Finished Drilling
1999-02-21 Production Casing Operation Performed
1999-02-21 Rig Released
1999-02-21 Well Mode changed to Drilled and Cased
1999-03-02 Perforation Treatment Performed - Jet Perforation
1999-03-02 Well Log Performed
1999-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-03 Perforation Treatment Performed - Jet Perforation
1999-03-03 Plug Back Performed
1999-03-03 Well Log Performed
1999-03-04 Perforation Treatment Performed - Fractured
1999-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-06 Perforation Treatment Performed - Jet Perforation
1999-03-06 Plug Back Performed
1999-03-06 Well Log Performed
1999-03-08 Perforation Treatment Performed - Fractured
1999-03-10 Perforation Treatment Performed - Jet Perforation
1999-03-10 Well Log Performed
1999-03-10 Well Mode changed to Drilled and Cased
1999-03-17 Well Began Production
1999-03-17 Well Fluid changed to Gas
1999-03-17 Well Mode changed to Flowing
2001-06-21 Well Log Performed
2001-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-22 Plug Back Performed
2001-06-22 Well Fluid changed to Gas
2001-06-22 Well Mode changed to Abandoned Zone
2001-06-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-02 Perforation 977.00 980.00 20
2001-06-22 Packing Device Capped w/Cement 782.00 790.00 0
1999-03-03 Packing Device Capped w/Cement 976.00 978.00 0
1999-03-03 Perforation 961.00 963.00 20
1999-03-04 Fracture 961.00 963.00 0
1999-03-06 Packing Device Capped w/Cement 951.00 959.00 0
1999-03-06 Perforation 830.00 832.00 20
1999-03-08 Fracture 830.00 832.00 0
1999-03-10 Perforation 805.00 805.30 20
2001-06-22 Packing Device Capped w/Cement 821.00 829.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 554 0.0 0.0 0.0

For data sources see[5]

References