X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244042508000

Well Details

Well ID: 0244042508000
Loading map...
Location: 00/08-25-024-04W4/0
Location Alias: 00/08-25-24-04 W4M
Location Alias 2: 00/08-25-024-04 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 04
Section: 25
County/Municipality: Special Areas No. 3
Well Name: PAI BINDLOSS 8-25-24-4
Operator Name: Obsidian Energy Ltd.
License Number: 0218065
License Date: 1998-10-13
License Status: Suspension
Spud Date: 1998-10-30
Final Drill Date: 1998-11-02
Well Total Depth: 1015.00 m
Surface Hole Latitude: 51.072316
Surface Hole Longitude: -110.424413

For data sources see[1][2]

Well History

Date Event
1998-10-13 Obtained License
1998-10-31 Surface Casing Operation Performed
1998-11-02 Finished Drilling
1998-11-02 Well Mode changed to Drilled and Cased
1998-11-03 Production Casing Operation Performed
1998-11-03 Rig Released
1998-11-03 Well Log Performed
1998-11-25 Perforation Treatment Performed - Jet Perforation
1998-11-25 Well Log Performed
1998-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-29 Well Log Performed
1998-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-30 Perforation Treatment Performed - Jet Perforation
1998-11-30 Plug Back Performed
1998-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-02 Perforation Treatment Performed - Jet Perforation
1998-12-02 Plug Back Performed
1998-12-02 Well Log Performed
1998-12-03 Perforation Treatment Performed - Jet Perforation
1998-12-03 Well Log Performed
1998-12-06 Well Began Production
1998-12-06 Well Fluid changed to Gas
1998-12-06 Well Mode changed to Flowing
1999-08-12 Well Fluid changed to Gas
1999-08-12 Well Mode changed to Suspended
2010-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-28 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-11-28 Plug Back Performed
2010-11-28 Well Fluid changed to Gas
2010-11-28 Well Log Performed
2010-11-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-11-25 Perforation 1003.00 1008.00 20
2010-11-28 Packing Dev Cpd w/Res-Gyp Cem 965.00 968.00 0
2010-11-28 Packing Device Capped w/Cement 952.00 960.00 0
2010-11-28 Packing Device Capped w/Cement 790.00 798.00 0
1998-11-27 Acid Treatment 1003.00 1008.00 0
1998-11-30 Packing Device Capped w/Cement 1000.00 1001.00 0
1998-11-30 Perforation 989.00 995.00 20
1998-12-01 Acid Treatment 989.00 995.00 0
1998-12-02 Packing Device Capped w/Cement 985.00 986.00 0
1998-12-02 Perforation 801.00 802.00 14
1998-12-03 Perforation 962.00 965.00 14
1998-12-03 Perforation 971.00 977.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 576 0.0 0.0 0.0
1999 1339 0.0 0.0 0.0

For data sources see[5]

References