X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244022910000

Well Details

Well ID: 0244022910000
Loading map...
Location: 00/10-29-024-02W4/0
Location Alias: 00/10-29-24-02 W4M
Location Alias 2: 00/10-29-024-02 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 02
Section: 29
County/Municipality: Municipal District of Acadia No. 34
Well Name: CASS EMPRESS 10-29-24-2
Operator Name: M.L. Cass Petroleum Corporation
License Number: 0073513
License Date: 1978-12-15
License Status: Abandoned
Spud Date: 1978-12-28
Final Drill Date: 1979-01-27
Well Total Depth: 1410.00 m
Surface Hole Latitude: 51.075297
Surface Hole Longitude: -110.245484

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-15 Obtained License
1979-01-02 Drill Stem Test Performed
1979-01-05 Kick Occurred
1979-01-22 Lost Circulation Occurred
1979-01-27 Finished Drilling
1979-01-30 Drill Stem Test Performed
1979-02-26 Perforation Treatment Performed - Jet Perforation
1979-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-02-28 Perforation Treatment Performed - Jet Perforation
1979-03-05 Perforation Treatment Performed - Jet Perforation
1979-03-08 Perforation Treatment Performed - Jet Perforation
1979-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-11 Perforation Treatment Performed - Jet Perforation
1979-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-14 Perforation Treatment Performed - Jet Perforation
1979-06-17 Perforation Treatment Performed - Jet Perforation
1979-06-18 Perforation Treatment Performed - Cement Squeeze
1979-06-20 Perforation Treatment Performed - Jet Perforation
1979-06-20 Well Mode changed to Drilled and Cased
1994-08-11 Well Began Production
1994-08-11 Well Fluid changed to Gas
1994-08-11 Well Mode changed to Flowing
1998-08-01 Well Fluid changed to Gas
1998-08-01 Well Mode changed to Suspended
2000-09-28 Well Fluid changed to Gas
2000-09-28 Well Mode changed to Closed
2003-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-05 Plug Back Performed
2003-02-05 Well Fluid changed to Gas
2003-02-05 Well Mode changed to Abandoned Zone
2003-02-06 Perforation Treatment Performed - Jet Perforation
2003-02-07 Perforation Treatment Performed - Remedial Casing
2003-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-10 Perforation Treatment Performed - Jet Perforation
2003-02-11 Perforation Treatment Performed - Remedial Casing
2003-06-26 Perforation Treatment Performed - Jet Perforation
2003-06-27 Perforation Treatment Performed - Remedial Casing
2003-07-04 Perforation Treatment Performed - Jet Perforation
2003-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-08 Perforation Treatment Performed - Remedial Casing
2004-03-24 Well Abandoned
2004-03-24 Well Fluid changed to Gas
2004-03-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-26 Perforation 952.50 953.50 13
1979-03-14 Perforation 712.00 714.00 6
1979-06-17 Perforation 718.00 718.50 4
1979-06-18 Cement Squeeze 712.00 718.50 0
1979-06-20 Perforation 712.00 713.50 7
2003-02-05 Packing Device Capped w/Cement 696.00 704.00 0
2003-02-06 Perforation 650.20 652.20 13
2003-02-07 Remedial Casing Cementing 650.20 652.20 0
2003-02-10 Perforation 400.00 402.00 13
2003-02-10 Packing Device Capped w/Cement 638.00 646.00 0
2003-02-11 Remedial Casing Cementing 400.00 402.00 0
1979-02-27 Packing Device Capped w/Cement 932.00 932.00 0
2003-06-26 Perforation 321.00 323.00 13
2003-06-27 Remedial Casing Cementing 321.00 323.00 0
2003-07-04 Perforation 270.00 272.00 13
2003-07-08 Remedial Casing Cementing 270.00 272.00 0
2003-07-08 Packing Device Capped w/Cement 245.00 264.00 0
1979-02-28 Perforation 883.50 884.50 13
1979-02-28 Perforation 879.50 880.50 13
1979-03-05 Perforation 875.70 876.70 13
1979-03-08 Perforation 871.30 872.30 13
1979-03-10 Packing Device Capped w/Cement 840.00 850.00 0
1979-03-11 Perforation 835.00 836.00 13
1979-03-12 Packing Device Capped w/Cement 815.00 825.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2653 0.0 0.0 0.0
1995 6325 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-01-05 Kick 976.00 976.00
1979-01-22 Lost Circulation 1111.00 1127.00

For data sources see[6]

References