X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0235060616000

Well Details

Well ID: 0235060616000
Loading map...
Location: 00/16-06-023-06W5/0
Location Alias: 00/16-06-23-06 W5M
Location Alias 2: 00/16-06-023-06 W5/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 5
Range: 06
Section: 06
County/Municipality: Kananaskis Improvement District
Well Name: CALSTAN SHELL MOOSE MTN 16-6-23-6
Operator Name: Shell Canada Limited
License Number: 0016947
License Date: 1959-04-20
License Status: Issued
Spud Date: 1959-05-22
Final Drill Date: 1960-01-27
Well Total Depth: 4270.20 m
Surface Hole Latitude: 50.932371
Surface Hole Longitude: -114.819216

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-04-20 Obtained License
1959-06-22 Drill Stem Test Performed
1959-08-20 Drill Stem Test Performed
1959-08-21 Drill Stem Test Performed
1959-08-24 Drill Stem Test Performed
1959-08-31 Drill Stem Test Performed
1959-09-04 Drill Stem Test Performed
1959-09-10 Drill Stem Test Performed
1959-10-14 Drill Stem Test Performed
1959-11-01 Drill Stem Test Performed
1959-11-05 Drill Stem Test Performed
1960-01-27 Finished Drilling
1960-02-01 Production Casing Operation Performed
1960-02-05 Perforation Treatment Performed - Open-Hole Completion
1960-02-06 Perforation Treatment Performed - Acid Wash - No Pressure
1960-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-18 Perforation Treatment Performed - Cement Plug
1960-02-19 Perforation Treatment Performed - Jet Perforation
1960-02-20 Perforation Treatment Performed - Jet Perforation
1960-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-28 Well Mode changed to Drilled and Cased
1976-02-11 Perforation Treatment Performed - Jet Perforation
1985-01-22 Perforation Treatment Performed - Jet Perforation
1985-01-22 Well Log Performed
1985-01-23 Perforation Treatment Performed - Cement Squeeze
1985-01-28 Perforation Treatment Performed - Acid Wash - No Pressure
1985-01-30 Well Log Performed
1985-02-02 Well Log Performed
1985-05-24 Perforation Treatment Performed - Fractured
1985-06-22 Perforation Treatment Performed - Fractured
1985-06-26 Well Log Performed
1985-12-06 Well Began Production
1985-12-06 Well Fluid changed to Gas
1985-12-06 Well Mode changed to Flowing
1994-08-15 Well Log Performed
2011-04-30 Well Fluid changed to Gas
2011-04-30 Well Mode changed to Pumping
2012-11-21 Well Fluid changed to Gas
2012-11-21 Well Mode changed to Suspended
2015-08-01 Well Fluid changed to Gas
2015-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-02-05 Open Hole/Barefoot Completion 3064.80 3259.20 0
1960-02-19 Perforation 2322.00 2323.20 13
1960-02-19 Perforation 2314.00 2317.10 13
1960-02-19 Perforation 2303.10 2309.20 13
1960-02-19 Perforation 2297.00 2303.10 13
1960-02-19 Perforation 2290.90 2297.00 13
1960-02-19 Perforation 2284.20 2290.90 13
1960-02-20 Perforation 2253.40 2284.20 13
1960-02-21 Acid Treatment 2253.40 2368.00 0
1960-02-28 Acid Treatment 2253.40 2368.00 0
1976-02-11 Perforation 2217.10 2218.90 13
1960-02-06 Acid Wash 3064.80 3259.20 0
1985-01-22 Perforation 1013.70 1014.20 13
1985-01-23 Cement Squeeze 1013.70 1014.20 0
1985-01-28 Acid Wash 2217.10 2218.90 0
1985-05-24 Fracture 2217.00 2368.00 0
1985-06-22 Fracture 2217.00 2368.00 0
1960-02-11 Acid Treatment 3063.20 3215.60 0
1960-02-18 Cement Plug 2721.90 3215.60 0
1960-02-19 Perforation 2361.90 2368.00 13
1960-02-19 Perforation 2359.50 2361.90 13
1960-02-19 Perforation 2334.50 2340.60 13
1960-02-19 Perforation 2331.40 2334.50 13
1960-02-19 Perforation 2327.10 2329.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 549 0.0 0.0 0.0
1986 4338 0.0 0.0 0.0
1987 3082 0.0 0.0 0.0
1988 1484 0.0 0.0 0.0
1989 270 0.0 0.0 0.0
1990 2644 0.0 0.0 0.0
1991 5010 0.0 0.0 0.0
1992 7322 0.0 0.0 0.0
1993 8020 0.0 0.0 0.0
1994 7824 0.0 0.0 0.0
1995 7839 0.0 0.0 0.0
1996 7494 0.0 0.0 0.0
1997 8211 0.0 0.0 0.0
1998 7849 0.0 0.0 0.0
1999 8114 0.0 0.0 0.0
2000 8375 0.0 0.0 0.0
2001 7795 0.0 0.0 0.0
2002 3619 0.0 0.0 0.0
2011 18 0.0 0.0 0.0
2015 2271 0.0 0.0 0.0
2016 7110 0.0 0.0 0.0
2017 5615 0.0 0.0 0.0
2018 6347 0.0 0.0 0.0
2019 7138 0.0 0.0 0.0
2020 1895 0.0 0.0 0.0

For data sources see[5]

References