If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234273616002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.007145,"lon":-113.634156,"icon":""}]} |
Location: 00/16-36-023-27W4/2 | |
Location Alias: 00/16-36-23-27 W4M | |
Location Alias 2: 00/16-36-023-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-36-23-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0357911 | |
License Date: 2006-05-26 | |
License Status: Issued | |
Spud Date: 2006-12-17 | |
Final Drill Date: 2007-01-11 | |
Well Total Depth: 1101.00 m | |
Surface Hole Latitude: 51.007145 | |
Surface Hole Longitude: -113.634156 |
Date | Event |
---|---|
2006-05-26 | Obtained License |
2006-12-17 | Surface Casing Operation Performed |
2007-01-11 | Finished Drilling |
2007-01-11 | Production Casing Operation Performed |
2007-01-11 | Rig Released |
2007-01-11 | Well Mode changed to Drilled and Cased |
2007-01-14 | Well Log Performed |
2007-01-24 | Perforation Treatment Performed - Jet Perforation |
2007-02-15 | Perforation Treatment Performed - Fractured |
2009-02-12 | Perforation Treatment Performed - Jet Perforation |
2009-02-13 | Perforation Treatment Performed - Jet Perforation |
2009-02-19 | Perforation Treatment Performed - Fractured |
2009-03-06 | Well Began Production |
2009-03-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-06 | Well Mode changed to Flowing |
2009-11-12 | Well Log Performed |
2009-12-17 | Perforation Treatment Performed - Jet Perforation |
2010-01-04 | Perforation Treatment Performed - Fractured |
2010-01-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-14 | Well Mode changed to Flowing |
2010-02-17 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-01-24 | Perforation | 587.00 | 588.00 | 13 |
2009-02-12 | Perforation | 574.10 | 574.60 | 14 |
2009-02-12 | Perforation | 560.00 | 561.00 | 14 |
2009-02-12 | Perforation | 553.20 | 553.70 | 14 |
2009-02-12 | Perforation | 549.20 | 549.70 | 14 |
2009-02-12 | Perforation | 527.80 | 528.80 | 14 |
2009-02-12 | Perforation | 524.00 | 524.50 | 14 |
2009-02-12 | Perforation | 513.50 | 514.00 | 14 |
2009-02-12 | Perforation | 508.80 | 509.30 | 14 |
2009-02-12 | Perforation | 409.50 | 410.00 | 14 |
2009-02-12 | Perforation | 404.50 | 405.00 | 14 |
2007-02-15 | Fracture | 587.00 | 588.00 | 0 |
2009-02-12 | Perforation | 393.50 | 394.00 | 14 |
2009-02-12 | Perforation | 379.10 | 379.60 | 14 |
2009-02-12 | Perforation | 322.90 | 323.40 | 14 |
2009-02-12 | Perforation | 268.20 | 268.70 | 14 |
2009-02-13 | Perforation | 536.80 | 537.30 | 14 |
2009-02-19 | Fracture | 268.20 | 697.10 | 0 |
2009-12-17 | Perforation | 402.00 | 403.00 | 13 |
2009-12-17 | Perforation | 391.00 | 392.00 | 13 |
2009-12-17 | Perforation | 266.50 | 267.50 | 13 |
2009-12-17 | Perforation | 474.00 | 475.00 | 13 |
2009-02-12 | Perforation | 696.60 | 697.10 | 14 |
2010-01-04 | Fracture | 391.00 | 392.00 | 0 |
2010-01-04 | Fracture | 266.50 | 267.50 | 0 |
2010-01-04 | Fracture | 402.00 | 403.00 | 0 |
2010-01-04 | Fracture | 268.20 | 697.10 | 0 |
2010-01-04 | Fracture | 474.00 | 475.00 | 0 |
2009-02-12 | Perforation | 664.70 | 665.20 | 14 |
2009-02-12 | Perforation | 658.30 | 661.30 | 14 |
2009-02-12 | Perforation | 655.30 | 656.30 | 14 |
2009-02-12 | Perforation | 643.70 | 644.20 | 14 |
2009-02-12 | Perforation | 638.50 | 639.50 | 14 |
2009-02-12 | Perforation | 578.90 | 579.40 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 7218 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 8739 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8678 | 0.0 | 0.0 | 0.0 |
2016 | 8653 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]