X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234270613000

Well Details

Well ID: 0234270613000
Loading map...
Location: 00/13-06-023-27W4/0
Location Alias: 00/13-06-23-27 W4M
Location Alias 2: 00/13-06-023-27 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 27
Section: 06
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 13-6-23-27
Operator Name: Ember Resources Inc.
License Number: 0231730
License Date: 2000-01-06
License Status: Issued
Spud Date: 2000-06-06
Final Drill Date: 2000-06-08
Well Total Depth: 911.00 m
Surface Hole Latitude: 50.932939
Surface Hole Longitude: -113.767876

For data sources see[1][2]

Well History

Date Event
2000-01-06 Obtained License
2000-06-07 Surface Casing Operation Performed
2000-06-08 Finished Drilling
2000-06-09 Production Casing Operation Performed
2000-06-09 Well Log Performed
2000-06-10 Rig Released
2000-06-10 Well Mode changed to Drilled and Cased
2000-07-08 Perforation Treatment Performed - Jet Perforation
2000-07-08 Well Log Performed
2000-07-12 Perforation Treatment Performed - Fractured
2000-10-23 Well Began Production
2000-10-23 Well Fluid changed to Gas
2000-10-23 Well Mode changed to Flowing
2012-02-02 Perforation Treatment Performed - Jet Perforation
2012-02-02 Well Log Performed
2012-02-09 Perforation Treatment Performed - Fractured
2012-09-07 Well Fluid changed to Coalbed Methane-Coals and Other
2012-09-07 Well Mode changed to Flowing
2014-05-14 Well Fluid changed to Coalbed Methane-Coals and Other
2014-05-14 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-08 Perforation 883.00 885.00 14
2012-02-02 Perforation 331.50 333.50 13
2012-02-02 Perforation 434.00 435.50 13
2012-02-02 Perforation 464.60 465.10 13
2012-02-02 Perforation 493.00 494.00 13
2012-02-02 Perforation 565.40 565.90 13
2012-02-02 Perforation 579.30 579.80 13
2012-02-02 Perforation 584.10 584.60 13
2012-02-02 Perforation 590.60 591.10 13
2012-02-02 Perforation 610.00 612.00 13
2012-02-02 Perforation 625.10 626.10 13
2000-07-08 Perforation 855.50 857.50 14
2012-02-02 Perforation 636.30 636.80 13
2012-02-02 Perforation 639.90 640.40 13
2012-02-02 Perforation 646.50 648.00 13
2012-02-02 Perforation 692.80 693.30 13
2012-02-02 Perforation 712.40 713.90 13
2012-02-02 Perforation 715.30 717.30 13
2012-02-02 Perforation 718.50 719.50 13
2012-02-02 Perforation 725.10 725.60 13
2012-02-02 Perforation 758.10 759.10 13
2012-02-09 Fracture 221.50 759.10 0
2000-07-08 Perforation 650.00 652.00 14
2000-07-08 Perforation 620.00 623.00 14
2000-07-12 Fracture 620.00 885.00 0
2012-02-02 Perforation 221.50 223.50 13
2012-02-02 Perforation 247.60 249.10 13
2012-02-02 Perforation 261.00 262.50 13
2012-02-02 Perforation 303.90 304.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1589 0.0 0.0 0.0
2001 7274 0.0 0.0 0.0
2002 8097 0.0 0.0 0.0
2003 7744 0.0 0.0 0.0
2004 8240 0.0 0.0 0.0
2005 8314 0.0 0.0 0.0
2006 8696 0.0 0.0 0.0
2007 8678 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8340 0.0 0.0 0.0
2010 8635 0.0 0.0 0.0
2011 8006 0.0 0.0 0.0
2012 3392 0.0 0.0 0.0
2013 8525 0.0 0.0 0.0
2014 8316 0.0 0.0 0.0
2015 8658 0.0 0.0 0.0
2016 8689 0.0 0.0 0.0
2017 8594 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 8681 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[5]

References