If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234270613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.932939,"lon":-113.767876,"icon":""}]} |
Location: 00/13-06-023-27W4/0 | |
Location Alias: 00/13-06-23-27 W4M | |
Location Alias 2: 00/13-06-023-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 27 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 13-6-23-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0231730 | |
License Date: 2000-01-06 | |
License Status: Issued | |
Spud Date: 2000-06-06 | |
Final Drill Date: 2000-06-08 | |
Well Total Depth: 911.00 m | |
Surface Hole Latitude: 50.932939 | |
Surface Hole Longitude: -113.767876 |
Date | Event |
---|---|
2000-01-06 | Obtained License |
2000-06-07 | Surface Casing Operation Performed |
2000-06-08 | Finished Drilling |
2000-06-09 | Production Casing Operation Performed |
2000-06-09 | Well Log Performed |
2000-06-10 | Rig Released |
2000-06-10 | Well Mode changed to Drilled and Cased |
2000-07-08 | Perforation Treatment Performed - Jet Perforation |
2000-07-08 | Well Log Performed |
2000-07-12 | Perforation Treatment Performed - Fractured |
2000-10-23 | Well Began Production |
2000-10-23 | Well Fluid changed to Gas |
2000-10-23 | Well Mode changed to Flowing |
2012-02-02 | Perforation Treatment Performed - Jet Perforation |
2012-02-02 | Well Log Performed |
2012-02-09 | Perforation Treatment Performed - Fractured |
2012-09-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-09-07 | Well Mode changed to Flowing |
2014-05-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2014-05-14 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-07-08 | Perforation | 883.00 | 885.00 | 14 |
2012-02-02 | Perforation | 331.50 | 333.50 | 13 |
2012-02-02 | Perforation | 434.00 | 435.50 | 13 |
2012-02-02 | Perforation | 464.60 | 465.10 | 13 |
2012-02-02 | Perforation | 493.00 | 494.00 | 13 |
2012-02-02 | Perforation | 565.40 | 565.90 | 13 |
2012-02-02 | Perforation | 579.30 | 579.80 | 13 |
2012-02-02 | Perforation | 584.10 | 584.60 | 13 |
2012-02-02 | Perforation | 590.60 | 591.10 | 13 |
2012-02-02 | Perforation | 610.00 | 612.00 | 13 |
2012-02-02 | Perforation | 625.10 | 626.10 | 13 |
2000-07-08 | Perforation | 855.50 | 857.50 | 14 |
2012-02-02 | Perforation | 636.30 | 636.80 | 13 |
2012-02-02 | Perforation | 639.90 | 640.40 | 13 |
2012-02-02 | Perforation | 646.50 | 648.00 | 13 |
2012-02-02 | Perforation | 692.80 | 693.30 | 13 |
2012-02-02 | Perforation | 712.40 | 713.90 | 13 |
2012-02-02 | Perforation | 715.30 | 717.30 | 13 |
2012-02-02 | Perforation | 718.50 | 719.50 | 13 |
2012-02-02 | Perforation | 725.10 | 725.60 | 13 |
2012-02-02 | Perforation | 758.10 | 759.10 | 13 |
2012-02-09 | Fracture | 221.50 | 759.10 | 0 |
2000-07-08 | Perforation | 650.00 | 652.00 | 14 |
2000-07-08 | Perforation | 620.00 | 623.00 | 14 |
2000-07-12 | Fracture | 620.00 | 885.00 | 0 |
2012-02-02 | Perforation | 221.50 | 223.50 | 13 |
2012-02-02 | Perforation | 247.60 | 249.10 | 13 |
2012-02-02 | Perforation | 261.00 | 262.50 | 13 |
2012-02-02 | Perforation | 303.90 | 304.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1589 | 0.0 | 0.0 | 0.0 |
2001 | 7274 | 0.0 | 0.0 | 0.0 |
2002 | 8097 | 0.0 | 0.0 | 0.0 |
2003 | 7744 | 0.0 | 0.0 | 0.0 |
2004 | 8240 | 0.0 | 0.0 | 0.0 |
2005 | 8314 | 0.0 | 0.0 | 0.0 |
2006 | 8696 | 0.0 | 0.0 | 0.0 |
2007 | 8678 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8340 | 0.0 | 0.0 | 0.0 |
2010 | 8635 | 0.0 | 0.0 | 0.0 |
2011 | 8006 | 0.0 | 0.0 | 0.0 |
2012 | 3392 | 0.0 | 0.0 | 0.0 |
2013 | 8525 | 0.0 | 0.0 | 0.0 |
2014 | 8316 | 0.0 | 0.0 | 0.0 |
2015 | 8658 | 0.0 | 0.0 | 0.0 |
2016 | 8689 | 0.0 | 0.0 | 0.0 |
2017 | 8594 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8681 | 0.0 | 0.0 | 0.0 |
2020 | 2136 | 0.0 | 0.0 | 0.0 |
For data sources see[5]