If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234263111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.001687,"lon":-113.62706,"icon":""}]} |
Location: 00/11-31-023-26W4/0 | |
Location Alias: 00/11-31-23-26 W4M | |
Location Alias 2: 00/11-31-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 31 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 11-31-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0349848 | |
License Date: 2006-01-23 | |
License Status: Amended | |
Spud Date: 2006-01-30 | |
Final Drill Date: 2006-02-11 | |
Well Total Depth: 829.00 m | |
Surface Hole Latitude: 51.001687 | |
Surface Hole Longitude: -113.627060 |
Date | Event |
---|---|
2006-01-23 | Obtained License |
2006-01-30 | Surface Casing Operation Performed |
2006-02-11 | Finished Drilling |
2006-02-11 | Well Mode changed to Drilled and Cased |
2006-02-12 | Production Casing Operation Performed |
2006-02-12 | Rig Released |
2006-02-17 | Well Log Performed |
2006-03-03 | Perforation Treatment Performed - Jet Perforation |
2006-03-06 | Perforation Treatment Performed - Fractured |
2006-08-22 | Well Began Production |
2006-08-22 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-08-22 | Well Mode changed to Flowing |
2010-12-18 | Perforation Treatment Performed - Jet Perforation |
2010-12-21 | Perforation Treatment Performed - Fractured |
2011-01-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-26 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-03 | Perforation | 697.70 | 698.20 | 13 |
2006-03-03 | Perforation | 568.00 | 568.50 | 13 |
2006-03-03 | Perforation | 559.50 | 560.00 | 13 |
2006-03-03 | Perforation | 552.70 | 553.20 | 13 |
2006-03-03 | Perforation | 548.00 | 548.50 | 13 |
2006-03-03 | Perforation | 537.70 | 538.20 | 13 |
2006-03-03 | Perforation | 533.20 | 533.70 | 13 |
2006-03-03 | Perforation | 531.90 | 532.40 | 13 |
2006-03-03 | Perforation | 527.20 | 527.70 | 13 |
2006-03-03 | Perforation | 514.50 | 515.00 | 13 |
2006-03-03 | Perforation | 510.80 | 511.30 | 13 |
2006-03-03 | Perforation | 663.20 | 663.70 | 13 |
2006-03-03 | Perforation | 407.50 | 408.00 | 13 |
2006-03-03 | Perforation | 387.50 | 388.00 | 13 |
2006-03-03 | Perforation | 377.50 | 378.00 | 13 |
2006-03-03 | Perforation | 319.60 | 320.10 | 13 |
2006-03-06 | Fracture | 319.60 | 698.20 | 0 |
2010-12-18 | Perforation | 250.00 | 253.00 | 13 |
2010-12-18 | Perforation | 237.00 | 239.00 | 13 |
2010-12-18 | Perforation | 324.50 | 326.50 | 13 |
2010-12-18 | Perforation | 293.00 | 295.00 | 13 |
2010-12-18 | Perforation | 585.00 | 588.00 | 13 |
2006-03-03 | Perforation | 659.70 | 660.20 | 13 |
2010-12-21 | Fracture | 237.00 | 588.00 | 0 |
2010-12-21 | Fracture | 319.60 | 698.20 | 0 |
2006-03-03 | Perforation | 655.50 | 656.00 | 13 |
2006-03-03 | Perforation | 654.40 | 654.90 | 13 |
2006-03-03 | Perforation | 653.50 | 654.00 | 13 |
2006-03-03 | Perforation | 651.00 | 651.50 | 13 |
2006-03-03 | Perforation | 636.30 | 636.80 | 13 |
2006-03-03 | Perforation | 581.80 | 582.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3168 | 0.0 | 0.0 | 0.0 |
2007 | 7282 | 0.0 | 0.0 | 0.0 |
2008 | 8649 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8351 | 0.0 | 0.0 | 0.0 |
2011 | 8158 | 0.0 | 0.0 | 0.0 |
2012 | 8759 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8681 | 0.0 | 0.0 | 0.0 |
2016 | 8654 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]