X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234262607000

Well Details

Well ID: 0234262607000
Loading map...
Location: 00/07-26-023-26W4/0
Location Alias: 00/07-26-23-26 W4M
Location Alias 2: 00/07-26-023-26 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 26
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 7-26-23-26
Operator Name: Ember Resources Inc.
License Number: 0436001
License Date: 2011-08-12
License Status: Issued
Spud Date: 2011-10-20
Final Drill Date: 2011-10-21
Well Total Depth: 1263.00 m
Surface Hole Latitude: 50.978896
Surface Hole Longitude: -113.515529

For data sources see[1][2]

Well History

Date Event
2011-08-12 Obtained License
2011-10-20 Direction Drilling Operation Performed - Deviate
2011-10-20 Surface Casing Operation Performed
2011-10-21 Finished Drilling
2011-10-21 Production Casing Operation Performed
2011-10-21 Rig Released
2011-10-21 Well Mode changed to Drilled and Cased
2011-10-24 Well Log Performed
2011-11-10 Perforation Treatment Performed - Jet Perforation
2011-11-17 Perforation Treatment Performed - Fractured
2012-01-10 Well Began Production
2012-01-10 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-20 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-10 Perforation 235.00 237.00 13
2011-11-10 Perforation 556.20 556.70 13
2011-11-10 Perforation 583.40 583.90 13
2011-11-10 Perforation 586.00 587.00 13
2011-11-10 Perforation 587.70 588.70 13
2011-11-10 Perforation 595.70 596.20 13
2011-11-10 Perforation 597.30 598.30 13
2011-11-10 Perforation 602.60 605.60 13
2011-11-10 Perforation 613.10 614.10 13
2011-11-10 Perforation 628.70 629.70 13
2011-11-10 Perforation 635.60 636.10 13
2011-11-10 Perforation 404.00 404.50 13
2011-11-10 Perforation 642.80 644.80 13
2011-11-10 Perforation 654.20 656.20 13
2011-11-10 Perforation 660.60 661.10 13
2011-11-10 Perforation 661.80 662.30 13
2011-11-10 Perforation 722.70 724.20 13
2011-11-10 Perforation 731.00 731.50 13
2011-11-10 Perforation 744.50 745.50 13
2011-11-10 Perforation 751.80 752.30 13
2011-11-10 Perforation 755.80 758.80 13
2011-11-10 Perforation 759.50 760.50 13
2011-11-10 Perforation 410.70 411.20 13
2011-11-10 Perforation 805.50 806.00 13
2011-11-10 Perforation 809.30 809.80 13
2011-11-10 Perforation 810.40 811.40 13
2011-11-10 Perforation 815.10 815.60 13
2011-11-17 Fracture 404.00 815.60 0
2011-11-10 Perforation 416.30 416.80 13
2011-11-10 Perforation 430.00 431.00 13
2011-11-10 Perforation 432.90 433.40 13
2011-11-10 Perforation 447.20 448.70 13
2011-11-10 Perforation 463.10 463.60 13
2011-11-10 Perforation 525.70 526.70 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4416 0.0 0.0 0.0
2013 8647 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8649 0.0 0.0 0.0
2016 8624 0.0 0.0 0.0
2017 8688 0.0 0.0 0.0
2018 8531 0.0 0.0 0.0
2019 8186 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

References