If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234262208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.971144,"lon":-113.552452,"icon":""}]} |
Location: 00/08-22-023-26W4/0 | |
Location Alias: 00/08-22-23-26 W4M | |
Location Alias 2: 00/08-22-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 8-22-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0434696 | |
License Date: 2011-06-29 | |
License Status: Amended | |
Spud Date: 2012-01-04 | |
Final Drill Date: 2012-01-05 | |
Well Total Depth: 1240.00 m | |
Surface Hole Latitude: 50.971144 | |
Surface Hole Longitude: -113.552452 |
Date | Event |
---|---|
2011-06-29 | Obtained License |
2012-01-04 | Direction Drilling Operation Performed - Deviate |
2012-01-05 | Finished Drilling |
2012-01-05 | Surface Casing Operation Performed |
2012-01-05 | Well Mode changed to Drilled and Cased |
2012-01-07 | Production Casing Operation Performed |
2012-01-07 | Rig Released |
2012-01-15 | Well Log Performed |
2012-01-26 | Perforation Treatment Performed - Jet Perforation |
2012-01-30 | Perforation Treatment Performed - Fractured |
2012-02-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-03 | Well Mode changed to Testing |
2012-02-10 | Perforation Treatment Performed - Jet Perforation |
2012-02-18 | Perforation Treatment Performed - Fractured |
2012-05-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-05-03 | Well Mode changed to Test Completed |
2012-10-23 | Well Began Production |
2012-10-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-10-23 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-04 | Precision Drilling Corporation | 155 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-04 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-26 | Perforation | 561.00 | 563.00 | 13 |
2012-02-10 | Perforation | 536.60 | 537.60 | 13 |
2012-02-10 | Perforation | 538.40 | 539.40 | 13 |
2012-02-10 | Perforation | 570.40 | 570.90 | 13 |
2012-02-10 | Perforation | 574.80 | 577.80 | 13 |
2012-02-10 | Perforation | 579.90 | 580.40 | 13 |
2012-02-10 | Perforation | 582.10 | 582.60 | 13 |
2012-02-10 | Perforation | 585.00 | 587.50 | 13 |
2012-02-10 | Perforation | 589.50 | 590.50 | 13 |
2012-02-10 | Perforation | 603.50 | 604.00 | 13 |
2012-02-10 | Perforation | 604.70 | 605.20 | 13 |
2012-01-26 | Perforation | 848.00 | 850.00 | 13 |
2012-02-10 | Perforation | 608.90 | 609.40 | 13 |
2012-02-10 | Perforation | 616.00 | 618.00 | 13 |
2012-02-10 | Perforation | 629.70 | 631.70 | 13 |
2012-02-10 | Perforation | 635.60 | 637.10 | 13 |
2012-02-10 | Perforation | 694.90 | 696.40 | 13 |
2012-02-10 | Perforation | 703.10 | 703.60 | 13 |
2012-02-10 | Perforation | 712.80 | 713.80 | 13 |
2012-02-10 | Perforation | 720.00 | 721.00 | 13 |
2012-02-10 | Perforation | 723.30 | 726.30 | 13 |
2012-02-10 | Perforation | 727.30 | 728.30 | 13 |
2012-01-30 | Fracture | 561.00 | 563.00 | 0 |
2012-02-10 | Perforation | 772.20 | 772.70 | 13 |
2012-02-10 | Perforation | 775.90 | 776.40 | 13 |
2012-02-10 | Perforation | 778.10 | 779.10 | 13 |
2012-02-10 | Perforation | 781.40 | 781.90 | 13 |
2012-02-10 | Perforation | 783.40 | 783.90 | 13 |
2012-02-10 | Perforation | 799.10 | 800.10 | 13 |
2012-02-18 | Fracture | 406.90 | 800.10 | 0 |
2012-01-30 | Fracture | 848.00 | 850.00 | 0 |
2012-02-10 | Perforation | 406.90 | 408.90 | 13 |
2012-02-10 | Perforation | 412.20 | 412.70 | 13 |
2012-02-10 | Perforation | 431.10 | 432.10 | 13 |
2012-02-10 | Perforation | 435.60 | 436.60 | 13 |
2012-02-10 | Perforation | 519.20 | 519.70 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1772 | 0.0 | 0.0 | 0.0 |
2013 | 8647 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8649 | 0.0 | 0.0 | 0.0 |
2016 | 8624 | 0.0 | 0.0 | 0.0 |
2017 | 8688 | 0.0 | 0.0 | 0.0 |
2018 | 8530 | 0.0 | 0.0 | 0.0 |
2019 | 8186 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[7]