If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234262202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.971198,"lon":-113.552652,"icon":""}]} |
Location: 00/02-22-023-26W4/0 | |
Location Alias: 00/02-22-23-26 W4M | |
Location Alias 2: 00/02-22-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-22-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0434680 | |
License Date: 2011-06-28 | |
License Status: Amended | |
Spud Date: 2012-01-10 | |
Final Drill Date: 2012-01-10 | |
Well Total Depth: 1142.00 m | |
Surface Hole Latitude: 50.971198 | |
Surface Hole Longitude: -113.552652 |
Date | Event |
---|---|
2011-06-28 | Obtained License |
2012-01-10 | Direction Drilling Operation Performed - Deviate |
2012-01-10 | Finished Drilling |
2012-01-10 | Surface Casing Operation Performed |
2012-01-10 | Well Mode changed to Drilled and Cased |
2012-01-11 | Production Casing Operation Performed |
2012-01-11 | Rig Released |
2012-01-15 | Well Log Performed |
2012-01-25 | Perforation Treatment Performed - Jet Perforation |
2012-01-29 | Perforation Treatment Performed - Fractured |
2012-02-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-03 | Well Mode changed to Testing |
2012-02-10 | Perforation Treatment Performed - Jet Perforation |
2012-02-17 | Perforation Treatment Performed - Fractured |
2012-05-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-05-03 | Well Mode changed to Test Completed |
2012-10-23 | Well Began Production |
2012-10-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-10-23 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-10 | Precision Drilling Corporation | 155 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-10 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-25 | Perforation | 571.00 | 573.00 | 13 |
2012-02-10 | Perforation | 471.80 | 472.80 | 13 |
2012-02-10 | Perforation | 564.10 | 564.60 | 13 |
2012-02-10 | Perforation | 580.10 | 580.60 | 13 |
2012-02-10 | Perforation | 590.50 | 591.00 | 13 |
2012-02-10 | Perforation | 593.70 | 594.70 | 13 |
2012-02-10 | Perforation | 596.30 | 596.80 | 13 |
2012-02-10 | Perforation | 598.20 | 599.20 | 13 |
2012-02-10 | Perforation | 611.80 | 612.30 | 13 |
2012-02-10 | Perforation | 612.80 | 613.30 | 13 |
2012-02-10 | Perforation | 615.70 | 616.70 | 13 |
2012-01-25 | Perforation | 822.00 | 824.00 | 13 |
2012-02-10 | Perforation | 621.40 | 623.40 | 13 |
2012-02-10 | Perforation | 632.90 | 633.40 | 13 |
2012-02-10 | Perforation | 635.00 | 635.50 | 13 |
2012-02-10 | Perforation | 638.00 | 639.50 | 13 |
2012-02-10 | Perforation | 688.40 | 689.40 | 13 |
2012-02-10 | Perforation | 695.50 | 696.00 | 13 |
2012-02-10 | Perforation | 704.40 | 705.40 | 13 |
2012-02-10 | Perforation | 706.40 | 706.90 | 13 |
2012-02-10 | Perforation | 710.10 | 710.60 | 13 |
2012-02-10 | Perforation | 713.20 | 715.20 | 13 |
2012-01-29 | Fracture | 571.00 | 573.00 | 0 |
2012-02-10 | Perforation | 716.10 | 717.10 | 13 |
2012-02-10 | Perforation | 755.10 | 755.60 | 13 |
2012-02-10 | Perforation | 758.10 | 759.10 | 13 |
2012-02-10 | Perforation | 762.10 | 762.60 | 13 |
2012-02-17 | Fracture | 447.80 | 762.60 | 0 |
2012-01-29 | Fracture | 822.00 | 824.00 | 0 |
2012-02-10 | Perforation | 447.80 | 449.30 | 13 |
2012-02-10 | Perforation | 453.20 | 453.70 | 13 |
2012-02-10 | Perforation | 457.40 | 457.90 | 13 |
2012-02-10 | Perforation | 463.80 | 464.30 | 13 |
2012-02-10 | Perforation | 466.70 | 467.70 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1771 | 0.0 | 0.0 | 0.0 |
2013 | 8647 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8649 | 0.0 | 0.0 | 0.0 |
2016 | 8624 | 0.0 | 0.0 | 0.0 |
2017 | 8688 | 0.0 | 0.0 | 0.0 |
2018 | 8530 | 0.0 | 0.0 | 0.0 |
2019 | 8186 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[7]