X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234261011000

Well Details

Well ID: 0234261011000
Loading map...
Location: 00/11-10-023-26W4/0
Location Alias: 00/11-10-23-26 W4M
Location Alias 2: 00/11-10-023-26 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 26
Section: 10
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 11-10-23-26
Operator Name: Ember Resources Inc.
License Number: 0421250
License Date: 2010-06-18
License Status: Amended
Spud Date: 2010-11-30
Final Drill Date: 2010-12-01
Well Total Depth: 1292.00 m
Surface Hole Latitude: 50.952023
Surface Hole Longitude: -113.562317

For data sources see[1][2]

Well History

Date Event
2010-06-18 Obtained License
2010-11-30 Direction Drilling Operation Performed - Deviate
2010-11-30 Surface Casing Operation Performed
2010-12-01 Finished Drilling
2010-12-01 Well Mode changed to Drilled and Cased
2010-12-02 Production Casing Operation Performed
2010-12-02 Rig Released
2010-12-02 Well Log Performed
2011-01-05 Perforation Treatment Performed - Jet Perforation
2011-01-17 Perforation Treatment Performed - Fractured
2011-02-15 Well Began Production
2011-02-15 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-15 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-30 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-05 Perforation 671.60 672.10 13
2011-01-05 Perforation 490.90 491.90 13
2011-01-05 Perforation 509.80 510.30 13
2011-01-05 Perforation 649.50 650.00 13
2011-01-05 Perforation 554.40 554.90 13
2011-01-05 Perforation 514.50 515.50 13
2011-01-05 Perforation 507.50 509.00 13
2011-01-05 Perforation 872.80 873.30 13
2011-01-05 Perforation 868.30 868.80 13
2011-01-05 Perforation 1140.00 1141.00 13
2011-01-05 Perforation 977.00 978.50 13
2011-01-05 Perforation 665.50 666.00 13
2011-01-05 Perforation 552.00 553.50 13
2011-01-05 Perforation 823.80 824.80 13
2011-01-05 Perforation 786.00 787.00 13
2011-01-05 Perforation 726.70 728.20 13
2011-01-05 Perforation 715.70 717.20 13
2011-01-05 Perforation 794.80 795.30 13
2011-01-05 Perforation 819.90 822.90 13
2011-01-05 Perforation 804.90 805.90 13
2011-01-17 Fracture 490.90 873.30 0
2011-01-17 Fracture 507.50 1141.00 0
2011-01-05 Perforation 654.40 656.40 13
2011-01-05 Perforation 672.60 673.60 13
2011-01-05 Perforation 706.80 708.80 13
2011-01-05 Perforation 697.70 698.20 13
2011-01-05 Perforation 677.20 678.20 13
2011-01-05 Perforation 496.50 497.00 13
2011-01-05 Perforation 492.20 493.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7678 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 8722 0.0 0.0 0.0
2015 7573 0.0 0.0 0.0
2016 5821 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8693 0.0 0.0 0.0
2019 8716 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

References