If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234260603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.923797,"lon":-113.622334,"icon":""}]} |
Location: 00/03-06-023-26W4/0 | |
Location Alias: 00/03-06-23-26 W4M | |
Location Alias 2: 00/03-06-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 3-6-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0246202 | |
License Date: 2000-12-07 | |
License Status: Issued | |
Spud Date: 2000-12-17 | |
Final Drill Date: 2000-12-19 | |
Well Total Depth: 1045.00 m | |
Surface Hole Latitude: 50.923797 | |
Surface Hole Longitude: -113.622334 |
Date | Event |
---|---|
2000-12-07 | Obtained License |
2000-12-18 | Surface Casing Operation Performed |
2000-12-19 | Finished Drilling |
2000-12-19 | Production Casing Operation Performed |
2000-12-19 | Rig Released |
2000-12-19 | Well Mode changed to Drilled and Cased |
2001-01-18 | Well Log Performed |
2001-01-25 | Well Log Performed |
2001-02-02 | Perforation Treatment Performed - Jet Perforation |
2001-02-19 | Perforation Treatment Performed - Jet Perforation |
2003-10-12 | Well Log Performed |
2003-10-16 | Perforation Treatment Performed - Jet Perforation |
2003-10-16 | Well Log Performed |
2004-02-09 | Perforation Treatment Performed - Fractured |
2004-02-15 | Well Fluid changed to Gas |
2004-02-15 | Well Mode changed to Testing |
2005-02-11 | Well Began Production |
2005-02-11 | Well Fluid changed to Gas |
2005-02-11 | Well Mode changed to Flowing |
2009-01-30 | Perforation Treatment Performed - Jet Perforation |
2009-02-05 | Perforation Treatment Performed - Fractured |
2009-02-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-02-02 | Perforation | 950.00 | 953.50 | 7 |
2009-01-30 | Perforation | 652.90 | 653.40 | 13 |
2009-01-30 | Perforation | 640.90 | 641.40 | 13 |
2009-01-30 | Perforation | 625.40 | 626.40 | 13 |
2009-01-30 | Perforation | 577.80 | 578.80 | 13 |
2009-01-30 | Perforation | 573.80 | 574.80 | 13 |
2009-01-30 | Perforation | 570.50 | 571.00 | 13 |
2009-01-30 | Perforation | 557.80 | 558.80 | 13 |
2009-01-30 | Perforation | 549.80 | 550.30 | 13 |
2009-01-30 | Perforation | 546.10 | 546.60 | 13 |
2009-01-30 | Perforation | 529.50 | 530.00 | 13 |
2001-02-19 | Perforation | 780.00 | 783.00 | 7 |
2009-01-30 | Perforation | 528.50 | 529.00 | 13 |
2009-01-30 | Perforation | 527.30 | 527.80 | 13 |
2009-01-30 | Perforation | 521.80 | 522.30 | 13 |
2009-01-30 | Perforation | 513.30 | 513.80 | 13 |
2009-01-30 | Perforation | 505.80 | 507.80 | 13 |
2009-01-30 | Perforation | 459.00 | 459.50 | 13 |
2009-01-30 | Perforation | 410.50 | 411.00 | 13 |
2009-01-30 | Perforation | 405.30 | 405.80 | 13 |
2009-01-30 | Perforation | 389.60 | 391.60 | 13 |
2009-01-30 | Perforation | 383.70 | 384.20 | 13 |
2003-10-16 | Perforation | 603.00 | 605.00 | 13 |
2009-01-30 | Perforation | 376.60 | 380.60 | 13 |
2009-01-30 | Perforation | 368.90 | 369.40 | 13 |
2009-01-30 | Perforation | 334.90 | 335.40 | 13 |
2009-01-30 | Perforation | 269.10 | 269.60 | 13 |
2009-02-05 | Fracture | 269.10 | 702.30 | 0 |
2004-02-09 | Fracture | 950.50 | 953.50 | 0 |
2004-02-09 | Fracture | 780.00 | 783.00 | 0 |
2004-02-09 | Fracture | 603.00 | 605.00 | 0 |
2009-01-30 | Perforation | 701.80 | 702.30 | 13 |
2009-01-30 | Perforation | 658.00 | 658.50 | 13 |
2009-01-30 | Perforation | 654.30 | 655.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 7728 | 0.0 | 0.0 | 0.0 |
2006 | 8717 | 0.0 | 0.0 | 0.0 |
2007 | 8662 | 0.0 | 0.0 | 0.0 |
2008 | 8700 | 0.0 | 0.0 | 0.0 |
2009 | 8310 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 8759 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8722 | 0.0 | 0.0 | 0.0 |
2015 | 8745 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8733 | 0.0 | 0.0 | 0.0 |
2018 | 8693 | 0.0 | 0.0 | 0.0 |
2019 | 8716 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]