If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234253603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.996234,"lon":-113.368417,"icon":""}]} |
Location: 00/03-36-023-25W4/0 | |
Location Alias: 00/03-36-23-25 W4M | |
Location Alias 2: 00/03-36-023-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 3-36-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0342078 | |
License Date: 2005-11-06 | |
License Status: Issued | |
Spud Date: 2005-12-21 | |
Final Drill Date: 2005-12-28 | |
Well Total Depth: 921.00 m | |
Surface Hole Latitude: 50.996234 | |
Surface Hole Longitude: -113.368417 |
Date | Event |
---|---|
2005-11-06 | Obtained License |
2005-12-21 | Surface Casing Operation Performed |
2005-12-28 | Finished Drilling |
2005-12-28 | Well Mode changed to Drilled and Cased |
2005-12-29 | Production Casing Operation Performed |
2005-12-29 | Rig Released |
2005-12-29 | Well Log Performed |
2006-01-03 | Well Log Performed |
2006-01-30 | Perforation Treatment Performed - Jet Perforation |
2006-02-18 | Well Fluid changed to Gas |
2006-02-18 | Well Mode changed to Testing |
2006-03-09 | Perforation Treatment Performed - Fractured |
2008-02-15 | Well Began Production |
2008-02-15 | Well Fluid changed to Gas |
2008-02-15 | Well Mode changed to Flowing |
2011-08-10 | Perforation Treatment Performed - Jet Perforation |
2011-09-12 | Perforation Treatment Performed - Fractured |
2011-09-27 | Perforation Treatment Performed - Jet Perforation |
2011-10-13 | Perforation Treatment Performed - Fractured |
2011-10-18 | Perforation Treatment Performed - Fractured |
2011-10-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-25 | Well Mode changed to Flowing |
2016-06-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-30 | Perforation | 765.00 | 766.00 | 13 |
2011-09-27 | Perforation | 227.10 | 227.60 | 13 |
2011-09-27 | Perforation | 231.00 | 231.50 | 13 |
2011-09-27 | Perforation | 240.10 | 240.60 | 13 |
2011-09-27 | Perforation | 245.50 | 246.00 | 13 |
2011-09-27 | Perforation | 249.80 | 250.30 | 13 |
2011-09-27 | Perforation | 297.80 | 298.30 | 13 |
2011-09-27 | Perforation | 338.90 | 339.40 | 13 |
2011-09-27 | Perforation | 343.50 | 344.50 | 13 |
2011-09-27 | Perforation | 347.80 | 348.30 | 13 |
2011-09-27 | Perforation | 351.60 | 352.70 | 13 |
2006-01-30 | Perforation | 763.00 | 764.00 | 13 |
2011-09-27 | Perforation | 357.30 | 358.30 | 13 |
2011-09-27 | Perforation | 363.10 | 364.70 | 13 |
2011-09-27 | Perforation | 366.20 | 366.70 | 13 |
2011-09-27 | Perforation | 368.90 | 370.50 | 13 |
2011-09-27 | Perforation | 378.70 | 379.20 | 13 |
2011-09-27 | Perforation | 384.50 | 385.00 | 13 |
2011-09-27 | Perforation | 389.60 | 390.10 | 13 |
2011-09-27 | Perforation | 390.90 | 391.40 | 13 |
2011-09-27 | Perforation | 392.80 | 393.30 | 13 |
2011-09-27 | Perforation | 401.80 | 404.80 | 13 |
2006-03-09 | Fracture | 763.00 | 766.00 | 0 |
2011-09-27 | Perforation | 407.00 | 409.00 | 13 |
2011-09-27 | Perforation | 441.00 | 442.50 | 13 |
2011-09-27 | Perforation | 457.10 | 458.10 | 13 |
2011-09-27 | Perforation | 476.30 | 476.80 | 13 |
2011-09-27 | Perforation | 490.70 | 491.20 | 13 |
2011-09-27 | Perforation | 493.20 | 493.70 | 13 |
2011-10-13 | Fracture | 357.30 | 493.70 | 0 |
2011-10-18 | Fracture | 215.70 | 358.30 | 0 |
2011-08-10 | Perforation | 591.50 | 593.50 | 13 |
2011-08-10 | Perforation | 613.50 | 615.00 | 13 |
2011-08-10 | Perforation | 775.00 | 776.50 | 13 |
2011-09-12 | Fracture | 591.50 | 593.50 | 0 |
2011-09-12 | Fracture | 763.00 | 776.50 | 0 |
2011-09-27 | Perforation | 215.70 | 216.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 96 | 0.0 | 0.0 | 0.0 |
2008 | 6836 | 0.0 | 0.0 | 0.0 |
2009 | 8630 | 0.0 | 0.0 | 0.0 |
2010 | 8665 | 0.0 | 0.0 | 0.0 |
2011 | 5801 | 0.0 | 0.0 | 0.0 |
2012 | 831 | 0.0 | 0.0 | 0.0 |
2013 | 7091 | 0.0 | 0.0 | 0.0 |
2014 | 7946 | 0.0 | 0.0 | 0.0 |
2015 | 7971 | 0.0 | 0.0 | 0.0 |
2016 | 3837 | 0.0 | 0.0 | 0.0 |
2017 | 3783 | 0.0 | 0.0 | 0.0 |
2018 | 8597 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]