If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234253511002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.003027,"lon":-113.389682,"icon":""}]} |
Location: 00/11-35-023-25W4/2 | |
Location Alias: 00/11-35-23-25 W4M | |
Location Alias 2: 00/11-35-023-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 35 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 11-35-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0296499 | |
License Date: 2003-11-20 | |
License Status: Issued | |
Spud Date: 2003-11-23 | |
Final Drill Date: 2003-11-30 | |
Well Total Depth: 939.00 m | |
Surface Hole Latitude: 51.003027 | |
Surface Hole Longitude: -113.389682 |
Date | Event |
---|---|
2003-11-20 | Obtained License |
2003-11-23 | Surface Casing Operation Performed |
2003-11-30 | Finished Drilling |
2003-11-30 | Production Casing Operation Performed |
2003-11-30 | Rig Released |
2003-11-30 | Well Mode changed to Drilled and Cased |
2003-12-20 | Well Log Performed |
2004-02-13 | Perforation Treatment Performed - Jet Perforation |
2004-02-18 | Perforation Treatment Performed - Fractured |
2004-07-03 | Perforation Treatment Performed - Jet Perforation |
2004-07-05 | Perforation Treatment Performed - Jet Perforation |
2004-07-24 | Perforation Treatment Performed - Fractured |
2004-08-17 | Well Fluid changed to Coalbed Methane-Coals Only |
2004-08-17 | Well Log Performed |
2004-08-17 | Well Mode changed to Testing |
2008-06-09 | Well Began Production |
2008-06-09 | Well Fluid changed to Coalbed Methane-Coals Only |
2008-06-09 | Well Mode changed to Flowing |
2008-07-21 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-02-13 | Perforation | 772.00 | 775.00 | 13 |
2004-07-03 | Perforation | 564.90 | 565.90 | 13 |
2004-07-03 | Perforation | 562.50 | 563.50 | 13 |
2004-07-03 | Perforation | 558.20 | 559.20 | 13 |
2004-07-03 | Perforation | 520.90 | 521.90 | 13 |
2004-07-03 | Perforation | 517.30 | 518.30 | 13 |
2004-07-05 | Perforation | 503.40 | 504.40 | 13 |
2004-07-05 | Perforation | 499.00 | 500.00 | 13 |
2004-07-05 | Perforation | 481.70 | 482.70 | 13 |
2004-07-05 | Perforation | 431.10 | 432.10 | 13 |
2004-07-05 | Perforation | 429.30 | 430.30 | 13 |
2004-02-13 | Perforation | 794.00 | 796.00 | 13 |
2004-07-05 | Perforation | 419.00 | 420.90 | 13 |
2004-07-05 | Perforation | 418.20 | 419.20 | 13 |
2004-07-05 | Perforation | 414.10 | 415.10 | 13 |
2004-07-05 | Perforation | 393.00 | 394.00 | 13 |
2004-07-05 | Perforation | 388.00 | 389.00 | 13 |
2004-07-05 | Perforation | 370.40 | 371.40 | 13 |
2004-07-05 | Perforation | 366.10 | 367.10 | 13 |
2004-07-05 | Perforation | 312.10 | 313.10 | 13 |
2004-07-05 | Perforation | 267.60 | 268.60 | 13 |
2004-07-05 | Perforation | 262.60 | 263.60 | 13 |
2004-02-13 | Perforation | 864.00 | 867.00 | 13 |
2004-07-05 | Perforation | 253.50 | 254.50 | 13 |
2004-07-05 | Perforation | 250.70 | 251.70 | 13 |
2004-07-05 | Perforation | 238.80 | 239.80 | 13 |
2004-07-24 | Fracture | 238.80 | 700.40 | 0 |
2004-02-18 | Fracture | 772.00 | 775.00 | 0 |
2004-02-18 | Fracture | 794.00 | 796.00 | 0 |
2004-02-18 | Fracture | 864.00 | 867.00 | 0 |
2004-07-03 | Perforation | 699.40 | 700.40 | 13 |
2004-07-03 | Perforation | 692.80 | 693.80 | 13 |
2004-07-03 | Perforation | 686.90 | 687.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1008 | 0.0 | 0.0 | 0.0 |
For data sources see[5]