X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234253305W02

Well Details

Well ID: 0234253305W02
Loading map...
Location: W0/05-33-023-25W4/2
Location Alias: W0/05-33-23-25 W4M
Location Alias 2: W0/05-33-023-25 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 33
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-33-23-25
Operator Name: Ember Resources Inc.
License Number: 0269764
License Date: 2002-05-03
License Status: Amended
Spud Date: 2002-05-13
Final Drill Date: 2002-05-19
Well Total Depth: 1774.00 m
Surface Hole Latitude: 51.001942
Surface Hole Longitude: -113.448855

For data sources see[1][2]

Well History

Date Event
2002-05-03 Obtained License
2002-05-15 Surface Casing Operation Performed
2002-05-16 Direction Drilling Operation Performed - Deviate
2002-05-19 Finished Drilling
2002-05-19 Well Mode changed to Drilled and Cased
2002-05-20 Well Log Performed
2002-05-21 Production Casing Operation Performed
2002-05-21 Rig Released
2002-09-10 Perforation Treatment Performed - Jet Perforation
2002-09-10 Well Log Performed
2004-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-12 Plug Back Performed
2004-06-12 Well Log Performed
2004-07-22 Perforation Treatment Performed - Jet Perforation
2004-08-18 Perforation Treatment Performed - Jet Perforation
2004-09-18 Perforation Treatment Performed - Jet Perforation
2004-10-16 Perforation Treatment Performed - Jet Perforation
2006-02-01 Perforation Treatment Performed - Jet Perforation
2006-02-01 Well Log Performed
2006-03-05 Perforation Treatment Performed - Fractured
2006-07-18 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-05-16 811.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-10 Perforation 1680.00 1681.50 17
2006-02-01 Perforation 626.60 627.10 13
2006-02-01 Perforation 623.60 624.10 13
2006-02-01 Perforation 617.50 618.00 13
2006-02-01 Perforation 585.30 585.80 13
2006-02-01 Perforation 581.60 582.10 13
2006-02-01 Perforation 576.60 577.10 13
2006-02-01 Perforation 560.80 561.30 13
2006-02-01 Perforation 552.20 552.70 13
2006-02-01 Perforation 545.60 546.10 13
2006-02-01 Perforation 484.90 485.40 13
2004-06-12 Packing Device Capped w/Cement 1662.00 1670.00 0
2006-02-01 Perforation 482.30 482.80 13
2006-02-01 Perforation 473.70 474.20 13
2006-02-01 Perforation 467.70 468.20 13
2006-02-01 Perforation 464.20 464.70 13
2006-02-01 Perforation 454.00 454.50 13
2006-02-01 Perforation 452.00 452.50 13
2006-02-01 Perforation 447.00 447.50 13
2006-02-01 Perforation 444.60 445.10 13
2006-02-01 Perforation 441.40 441.90 13
2006-02-01 Perforation 425.00 425.50 13
2004-07-22 Perforation 919.00 923.00 13
2006-02-01 Perforation 406.70 407.70 13
2006-02-01 Perforation 405.10 405.60 13
2006-02-01 Perforation 391.30 391.80 13
2006-02-01 Perforation 384.50 385.00 13
2006-02-01 Perforation 371.30 371.80 13
2006-02-01 Perforation 359.00 359.50 13
2006-02-01 Perforation 355.10 355.60 13
2006-02-01 Perforation 353.90 354.40 13
2006-02-01 Perforation 342.40 342.90 13
2006-02-01 Perforation 339.50 340.00 13
2004-07-22 Perforation 915.00 919.00 13
2006-02-01 Perforation 329.80 330.30 13
2006-02-01 Perforation 326.80 327.30 13
2006-02-01 Perforation 314.90 315.40 13
2006-02-01 Perforation 306.30 306.80 13
2006-02-01 Perforation 301.00 301.50 13
2006-03-05 Fracture 301.00 628.40 0
2004-08-18 Perforation 848.00 852.00 13
2004-09-18 Perforation 698.00 701.00 14
2004-10-16 Perforation 530.00 533.00 14
2006-02-01 Perforation 745.90 746.40 13
2006-02-01 Perforation 627.90 628.40 13

For data sources see[5]



References