If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234252905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.987993,"lon":-113.460101,"icon":""}]} |
Location: 00/05-29-023-25W4/0 | |
Location Alias: 00/05-29-23-25 W4M | |
Location Alias 2: 00/05-29-023-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-29-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420152 | |
License Date: 2010-04-29 | |
License Status: Issued | |
Spud Date: 2010-08-30 | |
Final Drill Date: 2010-08-31 | |
Well Total Depth: 1279.00 m | |
Surface Hole Latitude: 50.987993 | |
Surface Hole Longitude: -113.460101 |
Date | Event |
---|---|
2010-04-29 | Obtained License |
2010-08-30 | Direction Drilling Operation Performed - Deviate |
2010-08-30 | Surface Casing Operation Performed |
2010-08-31 | Finished Drilling |
2010-08-31 | Well Log Performed |
2010-08-31 | Well Mode changed to Drilled and Cased |
2010-09-01 | Production Casing Operation Performed |
2010-09-01 | Rig Released |
2010-10-22 | Perforation Treatment Performed - Jet Perforation |
2010-10-22 | Well Log Performed |
2010-11-18 | Perforation Treatment Performed - Fractured |
2010-12-06 | Perforation Treatment Performed - Jet Perforation |
2010-12-13 | Perforation Treatment Performed - Fractured |
2010-12-29 | Well Began Production |
2010-12-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-29 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-30 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-22 | Perforation | 1191.00 | 1193.00 | 13 |
2010-12-06 | Perforation | 830.80 | 831.80 | 13 |
2010-12-06 | Perforation | 785.60 | 786.60 | 13 |
2010-12-06 | Perforation | 784.00 | 785.00 | 13 |
2010-12-06 | Perforation | 779.20 | 779.70 | 13 |
2010-12-06 | Perforation | 762.20 | 763.20 | 13 |
2010-12-06 | Perforation | 740.80 | 741.80 | 13 |
2010-12-06 | Perforation | 672.70 | 673.70 | 13 |
2010-12-06 | Perforation | 665.10 | 666.10 | 13 |
2010-12-06 | Perforation | 654.90 | 656.90 | 13 |
2010-12-06 | Perforation | 649.00 | 649.50 | 13 |
2010-10-22 | Perforation | 686.50 | 688.50 | 13 |
2010-12-06 | Perforation | 644.10 | 645.10 | 13 |
2010-12-06 | Perforation | 631.10 | 632.10 | 13 |
2010-12-06 | Perforation | 625.00 | 626.00 | 13 |
2010-12-06 | Perforation | 615.90 | 616.90 | 13 |
2010-12-06 | Perforation | 607.70 | 608.70 | 13 |
2010-12-06 | Perforation | 603.50 | 604.00 | 13 |
2010-12-06 | Perforation | 575.00 | 575.50 | 13 |
2010-12-06 | Perforation | 540.40 | 540.90 | 13 |
2010-12-06 | Perforation | 485.50 | 486.00 | 13 |
2010-12-06 | Perforation | 462.50 | 464.00 | 13 |
2010-10-22 | Perforation | 676.00 | 678.00 | 13 |
2010-12-13 | Fracture | 462.50 | 832.70 | 0 |
2010-10-22 | Perforation | 302.50 | 304.50 | 13 |
2010-10-22 | Perforation | 267.00 | 269.00 | 13 |
2010-11-18 | Fracture | 1191.00 | 1193.00 | 0 |
2010-11-18 | Fracture | 686.50 | 688.50 | 0 |
2010-11-18 | Fracture | 676.00 | 678.00 | 0 |
2010-12-06 | Perforation | 832.20 | 832.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 72 | 0.0 | 0.0 | 0.0 |
2011 | 8718 | 0.0 | 0.0 | 0.0 |
2012 | 8692 | 0.0 | 0.0 | 0.0 |
2013 | 8594 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8602 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]