If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234252804020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.985403,"lon":-113.436765,"icon":""}]} |
Location: 02/04-28-023-25W4/0 | |
Location Alias: 02/04-28-23-25 W4M | |
Location Alias 2: 02/04-28-023-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 28 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 4-28-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423112 | |
License Date: 2010-09-01 | |
License Status: Issued | |
Spud Date: 2011-01-25 | |
Final Drill Date: 2011-01-26 | |
Well Total Depth: 1150.00 m | |
Surface Hole Latitude: 50.985403 | |
Surface Hole Longitude: -113.436765 |
Date | Event |
---|---|
2010-09-01 | Obtained License |
2011-01-25 | Direction Drilling Operation Performed - Deviate |
2011-01-25 | Surface Casing Operation Performed |
2011-01-26 | Finished Drilling |
2011-01-26 | Production Casing Operation Performed |
2011-01-26 | Rig Released |
2011-01-26 | Well Mode changed to Drilled and Cased |
2011-02-02 | Well Log Performed |
2011-02-23 | Perforation Treatment Performed - Jet Perforation |
2011-07-28 | Well Began Production |
2011-07-28 | Well Fluid changed to Gas |
2011-07-28 | Well Mode changed to Flowing |
2011-09-12 | Perforation Treatment Performed - Fractured |
2011-09-26 | Perforation Treatment Performed - Jet Perforation |
2011-10-17 | Perforation Treatment Performed - Fractured |
2011-10-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-25 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-25 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-23 | Perforation | 257.50 | 259.50 | 13 |
2011-09-26 | Perforation | 385.60 | 386.10 | 13 |
2011-09-26 | Perforation | 490.40 | 490.90 | 13 |
2011-09-26 | Perforation | 512.70 | 513.20 | 13 |
2011-09-26 | Perforation | 516.60 | 517.10 | 13 |
2011-09-26 | Perforation | 524.70 | 525.20 | 13 |
2011-09-26 | Perforation | 530.40 | 530.90 | 13 |
2011-09-26 | Perforation | 531.30 | 531.80 | 13 |
2011-09-26 | Perforation | 536.30 | 537.30 | 13 |
2011-09-26 | Perforation | 541.00 | 542.00 | 13 |
2011-09-26 | Perforation | 542.80 | 543.30 | 13 |
2011-02-23 | Perforation | 588.50 | 590.50 | 13 |
2011-09-26 | Perforation | 553.50 | 554.50 | 13 |
2011-09-26 | Perforation | 558.90 | 559.40 | 13 |
2011-09-26 | Perforation | 564.30 | 567.30 | 13 |
2011-09-26 | Perforation | 577.30 | 577.80 | 13 |
2011-09-26 | Perforation | 578.80 | 580.30 | 13 |
2011-09-26 | Perforation | 582.40 | 583.90 | 13 |
2011-09-26 | Perforation | 621.00 | 623.00 | 13 |
2011-09-26 | Perforation | 643.00 | 644.00 | 13 |
2011-09-26 | Perforation | 654.40 | 654.90 | 13 |
2011-09-26 | Perforation | 665.80 | 666.80 | 13 |
2011-02-23 | Perforation | 1105.50 | 1107.50 | 13 |
2011-09-26 | Perforation | 674.50 | 675.00 | 13 |
2011-09-26 | Perforation | 686.60 | 687.10 | 13 |
2011-09-26 | Perforation | 690.80 | 692.30 | 13 |
2011-09-26 | Perforation | 694.50 | 695.00 | 13 |
2011-09-26 | Perforation | 736.10 | 737.10 | 13 |
2011-09-26 | Perforation | 739.00 | 739.50 | 13 |
2011-09-26 | Perforation | 743.20 | 743.70 | 13 |
2011-09-26 | Perforation | 811.50 | 813.50 | 13 |
2011-10-17 | Fracture | 372.30 | 813.50 | 0 |
2011-09-12 | Fracture | 257.50 | 259.50 | 0 |
2011-09-12 | Fracture | 588.50 | 590.50 | 0 |
2011-09-12 | Fracture | 1105.50 | 1107.50 | 0 |
2011-09-26 | Perforation | 245.00 | 247.00 | 13 |
2011-09-26 | Perforation | 372.30 | 372.80 | 13 |
2011-09-26 | Perforation | 375.70 | 376.20 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3183 | 0.0 | 0.0 | 0.0 |
2012 | 8692 | 0.0 | 0.0 | 0.0 |
2013 | 8594 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 6137 | 0.0 | 0.0 | 0.0 |
2016 | 6433 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8602 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]