X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234252613000

Well Details

Well ID: 0234252613000
Loading map...
Location: 00/13-26-023-25W4/0
Location Alias: 00/13-26-23-25 W4M
Location Alias 2: 00/13-26-023-25 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 13-26-23-25
Operator Name: Ember Resources Inc.
License Number: 0267152
License Date: 2002-02-01
License Status: Issued
Spud Date: 2002-02-05
Final Drill Date: 2002-02-21
Well Total Depth: 977.00 m
Surface Hole Latitude: 50.993389
Surface Hole Longitude: -113.399482

For data sources see[1][2]

Well History

Date Event
2002-02-01 Obtained License
2002-02-05 Surface Casing Operation Performed
2002-02-21 Finished Drilling
2002-02-21 Well Log Performed
2002-02-22 Production Casing Operation Performed
2002-02-22 Rig Released
2002-02-22 Well Mode changed to Drilled and Cased
2002-03-13 Well Log Performed
2002-09-13 Perforation Treatment Performed - Jet Perforation
2002-10-09 Perforation Treatment Performed - Fractured
2002-11-03 Perforation Treatment Performed - Jet Perforation
2002-12-04 Perforation Treatment Performed - Fractured
2003-01-08 Perforation Treatment Performed - Jet Perforation
2003-01-15 Perforation Treatment Performed - Jet Perforation
2003-02-03 Perforation Treatment Performed - Jet Perforation
2003-02-17 Perforation Treatment Performed - Jet Perforation
2003-06-18 Well Began Production
2003-06-18 Well Fluid changed to Gas
2003-06-18 Well Mode changed to Flowing
2003-07-01 Well Fluid changed to Gas
2003-07-01 Well Mode changed to Suspended
2006-07-19 Perforation Treatment Performed - Casing Patch (Over Perfs)
2006-07-27 Perforation Treatment Performed - Casing Patch (Over Perfs)
2006-09-09 Perforation Treatment Performed - Jet Perforation
2006-11-01 Perforation Treatment Performed - Jet Perforation
2007-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-02 Plug Back Performed
2007-02-02 Well Fluid changed to Gas
2007-02-02 Well Mode changed to Abandoned Zone
2007-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-01 Plug Back Performed
2007-03-02 Perforation Treatment Performed - Jet Perforation
2007-03-05 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-13 Perforation 888.00 890.00 7
2003-02-17 Perforation 423.00 427.00 13
2006-07-19 Casing Patch 842.00 844.00 0
2006-07-27 Casing Patch 827.00 830.00 0
2006-09-09 Perforation 827.00 830.00 13
2006-11-01 Perforation 842.00 844.00 13
2007-02-02 Packing Device Capped w/Cement 872.00 880.00 0
2007-02-02 Packing Device Capped w/Cement 817.00 825.00 0
2007-03-01 Packing Device Capped w/Cement 642.00 650.00 0
2007-03-02 Perforation 580.40 580.90 13
2007-03-02 Perforation 574.30 574.80 13
2002-09-13 Perforation 886.00 888.00 7
2007-03-02 Perforation 533.20 533.70 13
2007-03-02 Perforation 521.40 521.90 13
2007-03-02 Perforation 516.20 516.70 13
2007-03-02 Perforation 498.50 499.50 13
2007-03-02 Perforation 445.60 448.60 13
2007-03-02 Perforation 437.50 438.00 13
2007-03-02 Perforation 436.30 436.80 13
2007-03-02 Perforation 435.30 435.80 13
2007-03-02 Perforation 429.60 430.60 13
2007-03-02 Perforation 427.70 428.20 13
2002-10-09 Fracture 886.00 890.00 0
2007-03-02 Perforation 413.20 413.70 13
2007-03-02 Perforation 408.40 409.40 13
2007-03-02 Perforation 388.10 388.60 13
2007-03-02 Perforation 384.60 385.10 13
2007-03-02 Perforation 339.80 340.30 13
2007-03-02 Perforation 289.40 289.90 13
2007-03-02 Perforation 273.60 274.10 13
2007-03-02 Perforation 260.50 261.00 13
2007-03-02 Perforation 257.50 258.00 13
2007-03-05 Fracture 257.50 580.90 0
2002-11-03 Perforation 842.00 844.00 13
2002-11-03 Perforation 827.00 830.00 13
2002-12-04 Fracture 827.00 844.00 0
2003-01-08 Perforation 780.00 783.00 13
2003-01-15 Perforation 655.00 658.00 13
2003-02-03 Perforation 482.00 485.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3 0.0 0.0 0.0

For data sources see[5]

References