X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234252611000

Well Details

Well ID: 0234252611000
Loading map...
Location: 00/11-26-023-25W4/0
Location Alias: 00/11-26-23-25 W4M
Location Alias 2: 00/11-26-023-25 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 11-26-23-25
Operator Name: Ember Resources Inc.
License Number: 0307423
License Date: 2004-04-20
License Status: Amended
Spud Date: 2005-06-05
Final Drill Date: 2005-07-11
Well Total Depth: 930.00 m
Surface Hole Latitude: 50.987880
Surface Hole Longitude: -113.389345

For data sources see[1][2]

Well History

Date Event
2004-04-20 Obtained License
2005-06-05 Surface Casing Operation Performed
2005-07-11 Finished Drilling
2005-07-11 Production Casing Operation Performed
2005-07-11 Rig Released
2005-07-11 Well Mode changed to Drilled and Cased
2005-07-15 Well Log Performed
2005-12-06 Perforation Treatment Performed - Jet Perforation
2005-12-20 Well Fluid changed to Gas
2005-12-20 Well Mode changed to Testing
2007-02-27 Perforation Treatment Performed - Jet Perforation
2007-03-04 Perforation Treatment Performed - Fractured
2007-12-18 Well Began Production
2007-12-18 Well Fluid changed to Coalbed Methane-Coals and Other
2007-12-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-06 Perforation 817.00 820.00 13
2007-02-27 Perforation 485.00 486.00 13
2007-02-27 Perforation 431.70 432.70 13
2007-02-27 Perforation 430.10 431.10 13
2007-02-27 Perforation 422.10 422.60 13
2007-02-27 Perforation 420.60 421.10 13
2007-02-27 Perforation 419.40 419.90 13
2007-02-27 Perforation 415.20 415.70 13
2007-02-27 Perforation 413.10 413.60 13
2007-02-27 Perforation 399.80 400.30 13
2007-02-27 Perforation 398.60 399.10 13
2005-12-06 Perforation 798.00 801.00 13
2007-02-27 Perforation 396.20 396.70 13
2007-02-27 Perforation 391.80 392.30 13
2007-02-27 Perforation 384.00 384.50 13
2007-02-27 Perforation 377.10 377.60 13
2007-02-27 Perforation 373.50 374.00 13
2007-02-27 Perforation 369.30 369.80 13
2007-02-27 Perforation 366.40 366.90 13
2007-02-27 Perforation 348.70 349.20 13
2007-02-27 Perforation 324.70 325.20 13
2007-02-27 Perforation 315.60 316.10 13
2007-02-27 Perforation 580.50 581.00 13
2007-02-27 Perforation 272.30 272.80 13
2007-02-27 Perforation 256.80 257.80 13
2007-02-27 Perforation 246.30 246.80 13
2007-02-27 Perforation 244.10 244.60 13
2007-02-27 Perforation 240.70 241.20 13
2007-02-27 Perforation 238.80 239.30 13
2007-02-27 Perforation 215.40 215.90 13
2007-03-04 Fracture 215.40 581.00 0
2007-02-27 Perforation 567.70 568.20 13
2007-02-27 Perforation 563.00 563.50 13
2007-02-27 Perforation 518.60 519.10 13
2007-02-27 Perforation 516.10 516.60 13
2007-02-27 Perforation 515.20 515.70 13
2007-02-27 Perforation 503.10 503.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 24 0.0 0.0 0.0
2007 327 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8758 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 8609 0.0 0.0 0.0
2013 8594 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8684 0.0 0.0 0.0
2016 8697 0.0 0.0 0.0
2017 8699 0.0 0.0 0.0
2018 8602 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References