If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234251007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.942341,"lon":-113.407041,"icon":""}]} |
Location: 00/07-10-023-25W4/0 | |
Location Alias: 00/07-10-23-25 W4M | |
Location Alias 2: 00/07-10-023-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 10 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-10-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0339786 | |
License Date: 2005-10-12 | |
License Status: Issued | |
Spud Date: 2006-01-06 | |
Final Drill Date: 2006-01-22 | |
Well Total Depth: 698.00 m | |
Surface Hole Latitude: 50.942341 | |
Surface Hole Longitude: -113.407041 |
Date | Event |
---|---|
2005-10-12 | Obtained License |
2006-01-06 | Surface Casing Operation Performed |
2006-01-22 | Finished Drilling |
2006-01-22 | Well Mode changed to Drilled and Cased |
2006-01-23 | Production Casing Operation Performed |
2006-01-23 | Rig Released |
2006-01-26 | Well Log Performed |
2006-02-18 | Perforation Treatment Performed - Jet Perforation |
2006-02-23 | Perforation Treatment Performed - Fractured |
2008-04-29 | Well Began Production |
2008-04-29 | Well Fluid changed to Coalbed Methane-Coals Only |
2008-04-29 | Well Mode changed to Flowing |
2009-11-11 | Well Log Performed |
2009-12-19 | Perforation Treatment Performed - Jet Perforation |
2010-01-06 | Perforation Treatment Performed - Fractured |
2010-01-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-15 | Well Mode changed to Flowing |
2010-02-19 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-18 | Perforation | 588.20 | 589.20 | 13 |
2006-02-18 | Perforation | 436.00 | 436.50 | 13 |
2006-02-18 | Perforation | 432.80 | 433.30 | 13 |
2006-02-18 | Perforation | 427.90 | 428.40 | 13 |
2006-02-18 | Perforation | 425.10 | 425.60 | 13 |
2006-02-18 | Perforation | 408.60 | 409.10 | 13 |
2006-02-18 | Perforation | 400.10 | 400.60 | 13 |
2006-02-18 | Perforation | 392.00 | 392.50 | 13 |
2006-02-18 | Perforation | 390.50 | 391.00 | 13 |
2006-02-18 | Perforation | 294.10 | 294.60 | 13 |
2006-02-18 | Perforation | 284.20 | 284.70 | 13 |
2006-02-18 | Perforation | 587.00 | 587.50 | 13 |
2006-02-18 | Perforation | 267.00 | 267.50 | 13 |
2006-02-18 | Perforation | 256.10 | 256.60 | 13 |
2006-02-18 | Perforation | 205.40 | 205.90 | 13 |
2006-02-23 | Fracture | 205.40 | 589.20 | 0 |
2009-12-19 | Perforation | 308.50 | 309.50 | 13 |
2009-12-19 | Perforation | 211.00 | 212.00 | 13 |
2010-01-06 | Fracture | 211.00 | 212.00 | 0 |
2010-01-06 | Fracture | 308.50 | 309.50 | 0 |
2010-01-06 | Fracture | 205.40 | 589.20 | 0 |
2006-02-18 | Perforation | 585.50 | 586.00 | 13 |
2006-02-18 | Perforation | 539.00 | 539.50 | 13 |
2006-02-18 | Perforation | 537.30 | 537.80 | 13 |
2006-02-18 | Perforation | 518.50 | 519.00 | 13 |
2006-02-18 | Perforation | 498.70 | 499.20 | 13 |
2006-02-18 | Perforation | 449.80 | 450.30 | 13 |
2006-02-18 | Perforation | 445.30 | 445.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 5879 | 0.0 | 0.0 | 0.0 |
2009 | 8738 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8742 | 0.0 | 0.0 | 0.0 |
2012 | 8692 | 0.0 | 0.0 | 0.0 |
2013 | 8594 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8660 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8601 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]