If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234250816003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.948362,"lon":-113.449634,"icon":""}]} |
Location: 00/16-08-023-25W4/3 | |
Location Alias: 00/16-08-23-25 W4M | |
Location Alias 2: 00/16-08-023-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 08 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-8-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0337051 | |
License Date: 2005-08-24 | |
License Status: Issued | |
Spud Date: 2005-11-16 | |
Final Drill Date: 2005-11-20 | |
Well Total Depth: 724.00 m | |
Surface Hole Latitude: 50.948362 | |
Surface Hole Longitude: -113.449634 |
Date | Event |
---|---|
2005-08-24 | Obtained License |
2005-11-16 | Surface Casing Operation Performed |
2005-11-20 | Finished Drilling |
2005-11-20 | Production Casing Operation Performed |
2005-11-20 | Rig Released |
2005-11-20 | Well Mode changed to Drilled and Cased |
2005-11-24 | Well Log Performed |
2005-12-10 | Perforation Treatment Performed - Jet Perforation |
2005-12-19 | Perforation Treatment Performed - Jet Perforation |
2006-01-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-01-26 | Perforation Treatment Performed - Jet Perforation |
2006-01-26 | Plug Back Performed |
2006-01-28 | Perforation Treatment Performed - Fractured |
2006-05-15 | Well Began Production |
2006-05-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-05-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-10 | Perforation | 676.00 | 678.00 | 13 |
2006-01-26 | Perforation | 535.60 | 536.10 | 13 |
2006-01-26 | Perforation | 518.70 | 519.20 | 13 |
2006-01-26 | Perforation | 466.60 | 467.10 | 13 |
2006-01-26 | Perforation | 461.60 | 462.10 | 13 |
2006-01-26 | Perforation | 452.90 | 453.40 | 13 |
2006-01-26 | Perforation | 445.90 | 446.40 | 13 |
2006-01-26 | Perforation | 442.30 | 442.80 | 13 |
2006-01-26 | Perforation | 433.30 | 433.80 | 13 |
2006-01-26 | Perforation | 429.20 | 429.70 | 13 |
2006-01-26 | Perforation | 427.50 | 428.00 | 13 |
2005-12-19 | Perforation | 499.00 | 500.00 | 13 |
2006-01-26 | Perforation | 421.30 | 421.80 | 13 |
2006-01-26 | Perforation | 413.80 | 414.30 | 13 |
2006-01-26 | Perforation | 411.40 | 411.90 | 13 |
2006-01-26 | Perforation | 390.50 | 391.00 | 13 |
2006-01-26 | Perforation | 328.70 | 329.20 | 13 |
2006-01-26 | Perforation | 298.10 | 298.60 | 13 |
2006-01-26 | Perforation | 289.10 | 289.60 | 13 |
2006-01-26 | Perforation | 286.20 | 286.70 | 13 |
2006-01-26 | Perforation | 275.60 | 276.10 | 13 |
2006-01-26 | Perforation | 222.00 | 222.50 | 13 |
2006-01-26 | Packing Device Capped w/Cement | 662.00 | 670.00 | 0 |
2006-01-28 | Fracture | 222.00 | 622.50 | 0 |
2006-01-26 | Perforation | 622.00 | 622.50 | 13 |
2006-01-26 | Perforation | 604.40 | 604.90 | 13 |
2006-01-26 | Perforation | 602.30 | 602.80 | 13 |
2006-01-26 | Perforation | 600.90 | 601.40 | 13 |
2006-01-26 | Perforation | 557.70 | 558.20 | 13 |
2006-01-26 | Perforation | 543.80 | 544.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 4800 | 0.0 | 0.0 | 0.0 |
2007 | 8683 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8742 | 0.0 | 0.0 | 0.0 |
2012 | 8692 | 0.0 | 0.0 | 0.0 |
2013 | 8594 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8601 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]