If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234250215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.932769,"lon":-113.384293,"icon":""}]} |
Location: 00/15-02-023-25W4/0 | |
Location Alias: 00/15-02-23-25 W4M | |
Location Alias 2: 00/15-02-023-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 02 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 15-2-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0337256 | |
License Date: 2005-08-29 | |
License Status: Issued | |
Spud Date: 2005-12-10 | |
Final Drill Date: 2005-12-13 | |
Well Total Depth: 962.00 m | |
Surface Hole Latitude: 50.932769 | |
Surface Hole Longitude: -113.384293 |
Date | Event |
---|---|
2005-08-29 | Obtained License |
2005-12-10 | Surface Casing Operation Performed |
2005-12-13 | Finished Drilling |
2005-12-13 | Well Mode changed to Drilled and Cased |
2005-12-14 | Production Casing Operation Performed |
2005-12-14 | Rig Released |
2005-12-14 | Well Log Performed |
2005-12-19 | Well Log Performed |
2006-02-25 | Perforation Treatment Performed - Jet Perforation |
2006-03-01 | Perforation Treatment Performed - Fractured |
2006-03-07 | Well Began Production |
2006-03-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-03-07 | Well Mode changed to Flowing |
2009-09-06 | Well Log Performed |
2009-09-18 | Perforation Treatment Performed - Jet Perforation |
2009-09-25 | Perforation Treatment Performed - Fractured |
2009-11-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-09 | Well Mode changed to Flowing |
2009-12-12 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-25 | Perforation | 586.00 | 586.50 | 13 |
2006-02-25 | Perforation | 435.20 | 435.70 | 13 |
2006-02-25 | Perforation | 423.70 | 424.20 | 13 |
2006-02-25 | Perforation | 407.00 | 407.50 | 13 |
2006-02-25 | Perforation | 405.10 | 405.60 | 13 |
2006-02-25 | Perforation | 403.40 | 403.90 | 13 |
2006-02-25 | Perforation | 394.50 | 395.00 | 13 |
2006-02-25 | Perforation | 384.80 | 385.30 | 13 |
2006-02-25 | Perforation | 383.70 | 384.20 | 13 |
2006-02-25 | Perforation | 289.80 | 290.30 | 13 |
2006-02-25 | Perforation | 264.60 | 265.10 | 13 |
2006-02-25 | Perforation | 583.10 | 583.60 | 13 |
2006-02-25 | Perforation | 256.90 | 257.40 | 13 |
2006-03-01 | Fracture | 256.90 | 586.50 | 0 |
2009-09-18 | Perforation | 327.00 | 328.00 | 13 |
2009-09-18 | Perforation | 353.00 | 354.00 | 13 |
2009-09-18 | Perforation | 307.50 | 308.50 | 13 |
2009-09-18 | Perforation | 279.00 | 280.00 | 13 |
2009-09-18 | Perforation | 298.80 | 299.80 | 13 |
2009-09-18 | Perforation | 433.00 | 434.00 | 13 |
2009-09-18 | Perforation | 273.50 | 274.50 | 13 |
2009-09-18 | Perforation | 366.00 | 367.00 | 13 |
2006-02-25 | Perforation | 537.20 | 537.70 | 13 |
2009-09-18 | Perforation | 414.00 | 416.00 | 13 |
2009-09-25 | Fracture | 307.50 | 308.50 | 0 |
2009-09-25 | Fracture | 327.00 | 328.00 | 0 |
2009-09-25 | Fracture | 279.00 | 280.00 | 0 |
2009-09-25 | Fracture | 298.80 | 299.80 | 0 |
2009-09-25 | Fracture | 414.00 | 416.00 | 0 |
2009-09-25 | Fracture | 256.90 | 586.50 | 0 |
2009-09-25 | Fracture | 353.00 | 354.00 | 0 |
2009-09-25 | Fracture | 366.00 | 367.00 | 0 |
2006-02-25 | Perforation | 533.00 | 533.50 | 13 |
2006-02-25 | Perforation | 521.20 | 521.70 | 13 |
2006-02-25 | Perforation | 515.70 | 516.20 | 13 |
2006-02-25 | Perforation | 494.50 | 495.00 | 13 |
2006-02-25 | Perforation | 448.10 | 448.60 | 13 |
2006-02-25 | Perforation | 442.40 | 442.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 7175 | 0.0 | 0.0 | 0.0 |
2007 | 8548 | 0.0 | 0.0 | 0.0 |
2008 | 8737 | 0.0 | 0.0 | 0.0 |
2009 | 8738 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8609 | 0.0 | 0.0 | 0.0 |
2013 | 8558 | 0.0 | 0.0 | 0.0 |
2014 | 8653 | 0.0 | 0.0 | 0.0 |
2015 | 8357 | 0.0 | 0.0 | 0.0 |
2016 | 8436 | 0.0 | 0.0 | 0.0 |
2017 | 8391 | 0.0 | 0.0 | 0.0 |
2018 | 7975 | 0.0 | 0.0 | 0.0 |
2019 | 3571 | 0.0 | 0.0 | 0.0 |
For data sources see[5]