X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234250108002

Well Details

Well ID: 0234250108002
Loading map...
Location: 00/08-01-023-25W4/2
Location Alias: 00/08-01-23-25 W4M
Location Alias 2: 00/08-01-023-25 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 8-1-23-25
Operator Name: Ember Resources Inc.
License Number: 0263859
License Date: 2001-12-12
License Status: Issued
Spud Date: 2001-12-14
Final Drill Date: 2001-12-16
Well Total Depth: 962.00 m
Surface Hole Latitude: 50.928353
Surface Hole Longitude: -113.357890

For data sources see[1][2]

Well History

Date Event
2001-12-12 Obtained License
2001-12-14 Lost Circulation Occurred
2001-12-15 Surface Casing Operation Performed
2001-12-16 Finished Drilling
2001-12-16 Production Casing Operation Performed
2001-12-16 Rig Released
2001-12-16 Well Mode changed to Drilled and Cased
2001-12-18 Well Log Performed
2002-02-25 Perforation Treatment Performed - Jet Perforation
2002-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-15 Plug Back Performed
2002-03-24 Perforation Treatment Performed - Jet Perforation
2002-08-13 Perforation Treatment Performed - Jet Perforation
2002-09-29 Perforation Treatment Performed - Jet Perforation
2003-02-20 Well Began Production
2003-02-20 Well Fluid changed to Gas
2003-02-20 Well Mode changed to Flowing
2004-07-20 Perforation Treatment Performed - Jet Perforation
2006-07-10 Perforation Treatment Performed - Jet Perforation
2006-07-12 Perforation Treatment Performed - Fractured
2006-07-19 Well Fluid changed to Coalbed Methane-Coals and Other
2006-07-19 Well Mode changed to Flowing
2010-12-10 Perforation Treatment Performed - Jet Perforation
2010-12-13 Perforation Treatment Performed - Fractured
2011-01-08 Perforation Treatment Performed - Fractured
2011-01-28 Well Fluid changed to Coalbed Methane-Coals and Other
2011-01-28 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-25 Perforation 856.00 858.00 7
2004-07-20 Perforation 391.00 395.00 13
2004-07-20 Perforation 388.00 391.00 13
2006-07-10 Perforation 562.70 563.20 13
2006-07-10 Perforation 548.10 549.10 13
2006-07-10 Perforation 543.90 544.40 13
2006-07-10 Perforation 498.60 499.10 13
2006-07-10 Perforation 494.60 495.10 13
2006-07-10 Perforation 480.30 480.80 13
2006-07-10 Perforation 475.50 476.00 13
2006-07-10 Perforation 455.40 455.90 13
2002-02-25 Perforation 851.00 853.00 7
2006-07-10 Perforation 409.30 409.80 13
2006-07-10 Perforation 403.60 404.60 13
2006-07-10 Perforation 397.90 398.40 13
2006-07-10 Perforation 382.40 382.90 13
2006-07-10 Perforation 379.00 379.50 13
2006-07-10 Perforation 368.50 369.00 13
2006-07-10 Perforation 367.10 367.60 13
2006-07-10 Perforation 365.90 366.40 13
2006-07-10 Perforation 365.00 365.50 13
2006-07-10 Perforation 358.60 359.10 13
2002-02-25 Perforation 847.00 849.00 7
2006-07-10 Perforation 350.10 350.60 13
2006-07-10 Perforation 349.30 349.80 13
2006-07-10 Perforation 343.00 343.50 13
2006-07-10 Perforation 302.20 302.70 13
2006-07-10 Perforation 295.30 295.80 13
2006-07-10 Perforation 293.70 294.20 13
2006-07-10 Perforation 288.80 289.30 13
2006-07-10 Perforation 280.80 281.30 13
2006-07-10 Perforation 262.50 263.00 13
2006-07-10 Perforation 254.30 254.80 13
2002-03-15 Packing Device Capped w/Cement 836.00 844.00 0
2006-07-10 Perforation 253.40 253.90 13
2006-07-10 Perforation 229.90 230.40 13
2006-07-10 Perforation 225.10 225.60 13
2006-07-10 Perforation 222.30 222.80 13
2006-07-12 Fracture 222.30 563.20 0
2010-12-10 Perforation 642.50 644.50 13
2010-12-10 Perforation 616.50 618.50 13
2010-12-10 Perforation 590.50 592.50 13
2010-12-10 Perforation 335.00 337.00 13
2010-12-10 Perforation 240.50 242.00 13
2002-03-24 Perforation 828.00 830.00 7
2010-12-13 Fracture 335.00 337.00 0
2011-01-08 Fracture 222.30 563.20 0
2011-01-08 Fracture 240.50 644.50 0
2002-03-24 Perforation 826.00 828.00 7
2002-08-13 Perforation 759.00 761.00 7
2002-09-29 Perforation 719.00 721.00 7
2002-09-29 Perforation 716.00 718.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 7336 0.0 0.0 0.0
2004 8008 0.0 0.0 0.0
2005 8643 0.0 0.0 0.0
2006 7825 0.0 0.0 0.0
2007 6824 0.0 0.0 0.0
2008 8737 0.0 0.0 0.0
2009 8738 0.0 0.0 0.0
2010 8159 0.0 0.0 0.0
2011 8105 0.0 0.0 0.0
2012 8609 0.0 0.0 0.0
2013 8558 0.0 0.0 0.0
2014 8653 0.0 0.0 0.0
2015 8358 0.0 0.0 0.0
2016 8436 0.0 0.0 0.0
2017 8391 0.0 0.0 0.0
2018 7976 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-12-14 Lost Circulation 0.10 5.00

For data sources see[6]

References