X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234242509023

Well Details

Well ID: 0234242509023
Loading map...
Location: 02/09-25-023-24W4/3
Location Alias: 02/09-25-23-24 W4M
Location Alias 2: 02/09-25-023-24 W4/03
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 24
Section: 25
County/Municipality: Wheatland County
Well Name: ECA CAVALIER 9-25-23-24
Operator Name: Lynx Energy ULC
License Number: 0277208
License Date: 2002-12-03
License Status: Amended
Spud Date: 2002-12-14
Final Drill Date: 2003-01-29
Well Total Depth: 1725.00 m
Surface Hole Latitude: 50.989329
Surface Hole Longitude: -113.218360

For data sources see[1][2]

Well History

Date Event
2002-12-03 Obtained License
2002-12-14 Surface Casing Operation Performed
2003-01-27 Direction Drilling Operation Performed - Deviate
2003-01-29 Finished Drilling
2003-01-29 Well Log Performed
2003-01-29 Well Mode changed to Drilled and Cased
2003-01-30 Production Casing Operation Performed
2003-01-30 Rig Released
2003-01-30 Well Log Performed
2003-02-10 Perforation Treatment Performed - Jet Perforation
2003-02-10 Well Log Performed
2003-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-20 Perforation Treatment Performed - Jet Perforation
2003-02-20 Plug Back Performed
2003-02-20 Well Log Performed
2010-07-12 Perforation Treatment Performed - Jet Perforation
2010-08-26 Perforation Treatment Performed - Jet Perforation
2010-08-26 Well Log Performed
2010-10-31 Perforation Treatment Performed - Fractured
2010-12-03 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-01-27 842.90 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-10 Perforation 1697.00 1698.50 17
2003-02-20 Packing Device Capped w/Cement 1693.00 1696.00 0
2003-02-20 Perforation 1682.00 1685.00 17
2010-07-12 Perforation 1666.50 1670.00 17
2010-07-12 Perforation 1662.00 1665.00 17
2010-08-26 Perforation 1467.00 1470.00 17
2010-10-31 Fracture 1467.00 1470.00 0

For data sources see[5]



References