X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234242415002

Well Details

Well ID: 0234242415002
Loading map...
Location: 00/15-24-023-24W4/2
Location Alias: 00/15-24-23-24 W4M
Location Alias 2: 00/15-24-023-24 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 24
Section: 24
County/Municipality: Wheatland County
Well Name: PCP CAVALIER 15-24-23-24
Operator Name: Lynx Energy ULC
License Number: 0156912
License Date: 1993-03-02
License Status: Issued
Spud Date: 1993-03-20
Final Drill Date: 1993-03-26
Well Total Depth: 1730.00 m
Surface Hole Latitude: 50.976637
Surface Hole Longitude: -113.220445

For data sources see[1][2]

Well History

Date Event
1993-03-02 Obtained License
1993-03-20 Lost Circulation Occurred
1993-03-21 Surface Casing Operation Performed
1993-03-26 Finished Drilling
1993-03-26 Well Mode changed to Drilled and Cased
1993-03-27 Well Log Performed
1993-03-28 Production Casing Operation Performed
1993-03-28 Rig Released
1993-08-18 Well Log Performed
1993-10-28 Well Log Performed
1993-10-30 Perforation Treatment Performed - Jet Perforation
1993-11-02 Perforation Treatment Performed - Fractured
1993-11-04 Well Log Performed
1993-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-05 Perforation Treatment Performed - Jet Perforation
1993-11-07 Perforation Treatment Performed - Fractured
1993-11-08 Well Log Performed
1993-11-09 Perforation Treatment Performed - Jet Perforation
1993-11-27 Well Log Performed
1993-11-30 Perforation Treatment Performed - Fractured
2004-05-19 Perforation Treatment Performed - Jet Perforation
2004-05-19 Well Log Performed
2004-05-28 Perforation Treatment Performed - Jet Perforation
2004-05-28 Well Log Performed
2004-06-13 Well Structure changed to Commingled
2010-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-19 Plug Back Performed
2010-08-19 Well Began Production
2010-08-19 Well Fluid changed to Gas
2010-08-19 Well Log Performed
2010-08-19 Well Mode changed to Flowing
2010-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-20 Plug Back Performed
2010-08-20 Well Log Performed
2011-08-21 Perforation Treatment Performed - Jet Perforation
2011-10-03 Well Fluid changed to Gas
2011-10-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-30 Perforation 1486.00 1491.00 20
2010-08-19 Packing Device Capped w/Cement 1440.80 1448.80 0
2010-08-20 Packing Device Capped w/Cement 1427.00 1435.00 0
2011-08-21 Perforation 433.00 434.00 13
2011-08-21 Perforation 436.00 438.00 13
2011-08-21 Perforation 723.00 725.00 13
2011-08-21 Perforation 763.00 765.00 13
2011-08-21 Perforation 829.00 831.00 13
2011-08-21 Perforation 865.00 867.00 13
1993-11-02 Fracture 1486.00 1491.00 0
1993-11-05 Packing Device Capped w/Cement 1466.50 1474.50 0
1993-11-05 Perforation 1456.00 1458.00 13
1993-11-07 Fracture 1456.00 1458.00 0
1993-11-09 Perforation 1440.00 1444.00 13
1993-11-30 Fracture 1440.00 1444.00 0
2004-05-19 Perforation 635.50 638.50 17
2004-05-28 Perforation 655.00 657.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 666 0.0 0.0 0.0
2011 149 0.0 0.0 0.0
2012 103 0.0 0.0 0.0
2013 57 0.0 0.0 0.0
2014 745 0.0 0.0 0.0
2015 275 0.0 0.0 0.0
2016 589 0.0 0.0 0.0
2017 224 0.0 0.0 0.0
2018 1395 0.0 0.0 0.0
2019 2181 0.0 0.0 0.0
2020 1439 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-03-20 Lost Circulation 75.00 207.00

For data sources see[6]

References