If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234232408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.969035,"lon":-113.076333,"icon":""}]} |
Location: 00/08-24-023-23W4/0 | |
Location Alias: 00/08-24-23-23 W4M | |
Location Alias 2: 00/08-24-023-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 23 | |
Section: 24 | |
County/Municipality: Wheatland County | |
Well Name: PCP PCR CAVALIER 8-24-23-23 | |
Operator Name: Lynx Energy ULC | |
License Number: 0230674 | |
License Date: 1999-12-16 | |
License Status: Issued | |
Spud Date: 2000-01-04 | |
Final Drill Date: 2000-01-07 | |
Well Total Depth: 1580.00 m | |
Surface Hole Latitude: 50.969035 | |
Surface Hole Longitude: -113.076333 |
Date | Event |
---|---|
1999-01-05 | Surface Casing Operation Performed |
1999-12-16 | Obtained License |
2000-01-07 | Finished Drilling |
2000-01-07 | Well Log Performed |
2000-01-08 | Well Log Performed |
2000-01-09 | Production Casing Operation Performed |
2000-01-09 | Rig Released |
2000-01-09 | Well Mode changed to Drilled and Cased |
2000-03-01 | Perforation Treatment Performed - Jet Perforation |
2000-03-01 | Well Log Performed |
2000-07-11 | Well Began Production |
2000-07-11 | Well Fluid changed to Gas |
2000-07-11 | Well Mode changed to Flowing |
2001-07-14 | Kick Occurred |
2001-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-15 | Perforation Treatment Performed - Jet Perforation |
2001-07-15 | Plug Back Performed |
2001-07-15 | Well Fluid changed to Gas |
2001-07-15 | Well Mode changed to Abandoned Zone |
2001-07-16 | Well Log Performed |
2001-07-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-20 | Perforation Treatment Performed - Jet Perforation |
2001-07-20 | Plug Back Performed |
2003-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-16 | Perforation Treatment Performed - Jet Perforation |
2003-06-16 | Plug Back Performed |
2003-07-16 | Perforation Treatment Performed - Fractured |
2011-10-23 | Perforation Treatment Performed - Jet Perforation |
2011-10-23 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-03-01 | Perforation | 1517.00 | 1518.50 | 20 |
2003-07-16 | Fracture | 277.00 | 281.00 | 0 |
2011-10-23 | Perforation | 237.40 | 238.40 | 13 |
2011-10-23 | Perforation | 242.90 | 244.90 | 13 |
2011-10-23 | Perforation | 248.40 | 249.40 | 13 |
2011-10-23 | Perforation | 258.00 | 258.50 | 13 |
2011-10-23 | Perforation | 437.90 | 438.40 | 13 |
2011-10-23 | Perforation | 439.80 | 440.30 | 13 |
2011-10-23 | Perforation | 443.80 | 444.30 | 13 |
2011-10-23 | Perforation | 453.00 | 454.00 | 13 |
2011-10-23 | Perforation | 595.00 | 597.00 | 13 |
2001-07-15 | Packing Device Capped w/Cement | 1500.00 | 1510.00 | 0 |
2011-10-23 | Perforation | 611.50 | 613.50 | 13 |
2001-07-15 | Perforation | 1321.00 | 1323.00 | 20 |
2001-07-20 | Packing Device Capped w/Cement | 1305.00 | 1315.00 | 0 |
2001-07-20 | Perforation | 743.50 | 745.00 | 20 |
2001-07-20 | Perforation | 735.00 | 737.00 | 20 |
2001-07-20 | Perforation | 731.50 | 733.50 | 20 |
2003-06-16 | Packing Device Capped w/Cement | 720.00 | 728.00 | 0 |
2003-06-16 | Perforation | 277.00 | 281.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 4001 | 0.0 | 0.0 | 0.0 |
2001 | 2709 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-07-14 | Kick | 1517.00 | 1517.00 |
For data sources see[6]