X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234231913000

Well Details

Well ID: 0234231913000
Loading map...
Location: 00/13-19-023-23W4/0
Location Alias: 00/13-19-23-23 W4M
Location Alias 2: 00/13-19-023-23 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 23
Section: 19
County/Municipality: Wheatland County
Well Name: ECA ECOG CAVALIER 13-19-23-23
Operator Name: Lynx Energy ULC
License Number: 0396310
License Date: 2008-05-05
License Status: Issued
Spud Date: 2008-07-07
Final Drill Date: 2008-07-23
Well Total Depth: 934.00 m
Surface Hole Latitude: 50.976079
Surface Hole Longitude: -113.212907

For data sources see[1][2]

Well History

Date Event
2008-05-05 Obtained License
2008-07-07 Surface Casing Operation Performed
2008-07-23 Finished Drilling
2008-07-23 Well Mode changed to Drilled and Cased
2008-07-24 Production Casing Operation Performed
2008-07-24 Rig Released
2008-07-30 Well Log Performed
2008-09-08 Perforation Treatment Performed - Jet Perforation
2008-09-19 Perforation Treatment Performed - Fractured
2008-09-22 Well Fluid changed to Gas
2008-09-22 Well Mode changed to Testing
2008-09-24 Well Began Production
2008-09-24 Well Fluid changed to Gas
2008-09-24 Well Mode changed to Flowing
2012-10-18 Perforation Treatment Performed - Jet Perforation
2012-10-23 Well Fluid changed to Coalbed Methane-Coals and Other
2012-10-23 Well Mode changed to Flowing
2013-01-25 Perforation Treatment Performed - Fractured
2013-02-05 Well Fluid changed to Coalbed Methane-Coals and Other
2013-02-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-08 Perforation 867.00 869.00 13
2008-09-19 Fracture 795.00 796.00 0
2008-09-19 Fracture 752.00 753.00 0
2008-09-19 Fracture 731.00 734.00 0
2008-09-19 Fracture 431.00 433.00 0
2012-10-18 Perforation 200.60 201.10 13
2012-10-18 Perforation 252.90 253.40 13
2012-10-18 Perforation 258.50 259.00 13
2012-10-18 Perforation 261.70 262.20 13
2012-10-18 Perforation 264.00 264.50 13
2012-10-18 Perforation 267.20 267.70 13
2008-09-08 Perforation 863.00 865.00 13
2012-10-18 Perforation 272.90 273.40 13
2012-10-18 Perforation 280.50 281.00 13
2012-10-18 Perforation 328.30 328.80 13
2012-10-18 Perforation 372.10 372.60 13
2012-10-18 Perforation 373.10 373.60 13
2012-10-18 Perforation 375.10 376.10 13
2012-10-18 Perforation 382.40 382.90 13
2012-10-18 Perforation 384.00 385.00 13
2012-10-18 Perforation 396.30 396.80 13
2012-10-18 Perforation 416.90 418.90 13
2008-09-08 Perforation 795.00 796.00 13
2012-10-18 Perforation 514.10 515.10 13
2012-10-18 Perforation 555.50 556.00 13
2012-10-18 Perforation 562.20 562.70 13
2012-10-18 Perforation 564.00 564.50 13
2013-01-25 Fracture 252.90 253.40 0
2013-01-25 Fracture 258.50 259.00 0
2013-01-25 Fracture 261.70 264.50 0
2013-01-25 Fracture 267.20 267.70 0
2013-01-25 Fracture 272.90 273.40 0
2013-01-25 Fracture 280.50 281.00 0
2008-09-08 Perforation 752.00 753.00 13
2013-01-25 Fracture 328.30 328.80 0
2013-01-25 Fracture 372.10 376.10 0
2013-01-25 Fracture 382.40 385.00 0
2013-01-25 Fracture 396.30 396.80 0
2013-01-25 Fracture 416.90 418.90 0
2013-01-25 Fracture 514.10 515.10 0
2013-01-25 Fracture 555.50 556.00 0
2013-01-25 Fracture 562.20 564.50 0
2008-09-08 Perforation 733.00 734.00 13
2008-09-08 Perforation 731.00 732.00 13
2008-09-08 Perforation 635.00 637.00 13
2008-09-08 Perforation 618.00 620.00 13
2008-09-08 Perforation 431.00 433.00 13

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-25 2013-01-25 N/A 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 100 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2380 0.0 0.0 0.0
2009 8684 0.0 0.0 0.0
2010 8693 0.0 0.0 0.0
2011 8698 0.0 0.0 0.0
2012 8652 0.0 0.0 0.0
2013 8652 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8668 0.0 0.0 0.0
2016 8732 0.0 0.0 0.0
2017 8661 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-18 No Incident Encountered 0.00 0.00
2013-01-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References