X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234231613003

Well Details

Well ID: 0234231613003
Loading map...
Location: 00/13-16-023-23W4/3
Location Alias: 00/13-16-23-23 W4M
Location Alias 2: 00/13-16-023-23 W4/03
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 23
Section: 16
County/Municipality: Wheatland County
Well Name: PCP CAVALIER 13-16-23-23
Operator Name: Lynx Energy ULC
License Number: 0161424
License Date: 1993-10-07
License Status: Issued
Spud Date: 1993-10-27
Final Drill Date: 1993-11-03
Well Total Depth: 1777.00 m
Surface Hole Latitude: 50.968224
Surface Hole Longitude: -113.160411

For data sources see[1][2]

Well History

Date Event
1993-10-07 Obtained License
1993-10-28 Surface Casing Operation Performed
1993-10-29 Direction Drilling Operation Performed - Deviate
1993-11-03 Finished Drilling
1993-11-03 Well Log Performed
1993-11-03 Well Mode changed to Drilled and Cased
1993-11-04 Drill Stem Test Performed
1993-11-06 Production Casing Operation Performed
1993-11-06 Rig Released
1993-12-06 Well Log Performed
1993-12-07 Perforation Treatment Performed - Jet Perforation
1995-06-06 Well Log Performed
1995-06-07 Perforation Treatment Performed - Jet Perforation
1995-06-07 Well Log Performed
1995-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-14 Well Log Performed
1996-01-30 Well Log Performed
1996-03-01 Perforation Treatment Performed - Fractured
1996-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-16 Perforation Treatment Performed - Jet Perforation
2001-02-16 Plug Back Performed
2001-02-17 Well Log Performed
2001-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-17 Plug Back Performed
2001-05-18 Perforation Treatment Performed - Jet Perforation
2001-05-18 Well Log Performed
2001-05-18 Well Mode changed to Drilled and Cased
2004-08-16 Perforation Treatment Performed - Jet Perforation
2004-08-16 Well Log Performed
2004-09-06 Perforation Treatment Performed - Fractured
2004-09-07 Well Fluid changed to Gas
2004-09-07 Well Mode changed to Testing
2004-11-05 Well Began Production
2004-11-05 Well Fluid changed to Gas
2004-11-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-10-29 595.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-07 Perforation 1736.00 1739.00 13
2001-05-18 Perforation 1475.50 1476.50 20
2001-05-18 Perforation 1472.00 1474.00 20
2004-08-16 Perforation 1463.00 1465.50 17
2004-09-06 Fracture 1463.00 1476.50 0
1993-12-07 Perforation 1743.00 1744.00 13
1995-06-07 Perforation 1730.00 1740.00 13
1995-06-13 Acid Treatment 1730.00 1744.00 0
1996-03-01 Fracture 1730.00 1740.00 0
1996-08-22 Acid Treatment 1730.00 1740.00 0
2001-02-16 Packing Device Capped w/Cement 1718.00 1728.00 0
2001-02-16 Perforation 1705.00 1706.50 20
2001-05-17 Packing Device Capped w/Cement 1690.00 1700.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1460 0.0 0.0 0.0
2005 6803 0.0 0.0 0.0
2006 1212 0.0 0.0 0.0
2007 1284 0.0 0.0 0.0
2008 4867 0.0 0.0 0.0
2009 8446 0.0 0.0 0.0
2010 8103 0.0 0.0 0.0
2011 8163 0.0 0.0 0.0
2012 8681 0.0 0.0 0.0
2013 8673 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 8633 0.0 0.0 0.0
2016 8722 0.0 0.0 0.0
2017 8661 0.0 0.0 0.0
2018 8672 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References