If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234220203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.925119,"lon":-112.975773,"icon":""}]} |
Location: 00/03-02-023-22W4/0 | |
Location Alias: 00/03-02-23-22 W4M | |
Location Alias 2: 00/03-02-023-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 22 | |
Section: 02 | |
County/Municipality: Wheatland County | |
Well Name: ECA HUSSAR 3-2-23-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0423019 | |
License Date: 2010-08-27 | |
License Status: Issued | |
Spud Date: 2010-12-01 | |
Final Drill Date: 2010-12-07 | |
Well Total Depth: 918.00 m | |
Surface Hole Latitude: 50.925119 | |
Surface Hole Longitude: -112.975773 |
Date | Event |
---|---|
2010-08-27 | Obtained License |
2010-12-01 | Surface Casing Operation Performed |
2010-12-07 | Finished Drilling |
2010-12-07 | Well Mode changed to Drilled and Cased |
2010-12-08 | Production Casing Operation Performed |
2010-12-08 | Rig Released |
2010-12-11 | Well Log Performed |
2011-02-03 | Perforation Treatment Performed - Jet Perforation |
2011-02-03 | Well Log Performed |
2011-02-05 | Well Fluid changed to Gas |
2011-02-05 | Well Mode changed to Testing |
2011-02-22 | Perforation Treatment Performed - Fractured |
2011-03-04 | Well Began Production |
2011-03-04 | Well Fluid changed to Gas |
2011-03-04 | Well Mode changed to Flowing |
2013-01-10 | Perforation Treatment Performed - Jet Perforation |
2013-01-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-01-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-03 | Perforation | 884.00 | 887.00 | 13 |
2011-02-03 | Perforation | 355.00 | 357.00 | 13 |
2011-02-03 | Perforation | 263.00 | 265.00 | 13 |
2011-02-03 | Perforation | 260.00 | 261.00 | 13 |
2011-02-22 | Fracture | 884.00 | 887.00 | 0 |
2011-02-22 | Fracture | 815.00 | 818.00 | 0 |
2011-02-22 | Fracture | 797.00 | 801.00 | 0 |
2011-02-22 | Fracture | 709.00 | 711.00 | 0 |
2011-02-22 | Fracture | 680.00 | 682.00 | 0 |
2011-02-22 | Fracture | 629.00 | 631.00 | 0 |
2011-02-22 | Fracture | 604.00 | 609.00 | 0 |
2011-02-03 | Perforation | 815.00 | 818.00 | 13 |
2011-02-22 | Fracture | 578.00 | 580.00 | 0 |
2011-02-22 | Fracture | 355.00 | 357.00 | 0 |
2011-02-22 | Fracture | 260.00 | 265.00 | 0 |
2013-01-10 | Perforation | 208.80 | 209.30 | 13 |
2013-01-10 | Perforation | 219.20 | 219.70 | 13 |
2013-01-10 | Perforation | 221.60 | 222.10 | 13 |
2013-01-10 | Perforation | 225.20 | 226.20 | 13 |
2013-01-10 | Perforation | 231.40 | 232.40 | 13 |
2013-01-10 | Perforation | 241.20 | 241.70 | 13 |
2013-01-10 | Perforation | 359.50 | 360.00 | 13 |
2011-02-03 | Perforation | 797.00 | 801.00 | 13 |
2013-01-10 | Perforation | 411.00 | 412.00 | 13 |
2013-01-10 | Perforation | 416.80 | 417.30 | 13 |
2013-01-10 | Perforation | 422.30 | 422.80 | 13 |
2013-01-10 | Perforation | 426.50 | 427.00 | 13 |
2013-01-10 | Perforation | 430.60 | 431.10 | 13 |
2011-02-03 | Perforation | 709.00 | 711.00 | 13 |
2011-02-03 | Perforation | 680.00 | 682.00 | 13 |
2011-02-03 | Perforation | 629.00 | 631.00 | 13 |
2011-02-03 | Perforation | 607.00 | 609.00 | 13 |
2011-02-03 | Perforation | 604.00 | 605.00 | 13 |
2011-02-03 | Perforation | 578.00 | 580.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6814 | 0.0 | 0.0 | 0.0 |
2012 | 8780 | 0.0 | 0.0 | 0.0 |
2013 | 8677 | 0.0 | 0.0 | 0.0 |
2014 | 8557 | 0.0 | 0.0 | 0.0 |
2015 | 8639 | 0.0 | 0.0 | 0.0 |
2016 | 8755 | 0.0 | 0.0 | 0.0 |
2017 | 8697 | 0.0 | 0.0 | 0.0 |
2018 | 8718 | 0.0 | 0.0 | 0.0 |
2019 | 8757 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]