X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234202802002

Well Details

Well ID: 0234202802002
Loading map...
Location: 00/02-28-023-20W4/2
Location Alias: 00/02-28-23-20 W4M
Location Alias 2: 00/02-28-023-20 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 20
Section: 28
County/Municipality: Wheatland County
Well Name: ECA ECOG HUSSAR 2-28-23-20
Operator Name: Lynx Energy ULC
License Number: 0309139
License Date: 2004-05-27
License Status: Issued
Spud Date: 2005-02-26
Final Drill Date: 2005-02-27
Well Total Depth: 1479.30 m
Surface Hole Latitude: 50.981037
Surface Hole Longitude: -112.732984

For data sources see[1][2]

Well History

Date Event
2004-05-27 Obtained License
2005-02-26 Surface Casing Operation Performed
2005-02-27 Direction Drilling Operation Performed - Deviate
2005-02-27 Finished Drilling
2005-02-27 Well Mode changed to Drilled and Cased
2005-02-28 Production Casing Operation Performed
2005-02-28 Well Log Performed
2005-03-01 Rig Released
2005-03-27 Perforation Treatment Performed - Jet Perforation
2005-03-27 Well Log Performed
2005-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-10 Perforation Treatment Performed - Jet Perforation
2005-05-10 Plug Back Performed
2005-05-10 Well Log Performed
2005-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-25 Perforation Treatment Performed - Jet Perforation
2005-05-25 Plug Back Performed
2005-05-25 Well Log Performed
2005-05-25 Well Mode changed to Abandoned Zone
2005-07-11 Perforation Treatment Performed - Fractured
2005-07-27 Perforation Treatment Performed - Jet Perforation
2005-07-27 Well Log Performed
2005-07-28 Perforation Treatment Performed - Jet Perforation
2005-08-08 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-02-27 740.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-27 Perforation 1442.00 1444.00 17
2005-07-28 Perforation 593.00 595.00 13
2005-08-08 Fracture 593.00 611.00 0
2005-03-27 Perforation 1443.00 1443.20 2
2005-05-10 Packing Device Capped w/Cement 1432.00 1440.00 0
2005-05-10 Perforation 1404.00 1406.00 17
2005-05-25 Packing Device Capped w/Cement 1392.00 1400.00 0
2005-05-25 Perforation 775.00 777.00 14
2005-07-11 Fracture 775.00 777.00 0
2005-07-27 Perforation 607.50 611.00 13
2005-07-27 Perforation 603.00 606.00 13

For data sources see[5]



References