X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234191310005

Well Details

Well ID: 0234191310005
Loading map...
Location: 00/10-13-023-19W4/5
Location Alias: 00/10-13-23-19 W4M
Location Alias 2: 00/10-13-023-19 W4/05
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 19
Section: 13
County/Municipality: Wheatland County
Well Name: TXNE COUNTESS 10-13-23-19
Operator Name: Torxen Energy Ltd.
License Number: 0015463
License Date: 1958-06-27
License Status: Issued
Spud Date: 1958-07-04
Final Drill Date: 1958-07-24
Well Total Depth: 1346.60 m
Surface Hole Latitude: 50.959548
Surface Hole Longitude: -112.525322

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-06-27 Obtained License
1958-07-11 Drill Stem Test Performed
1958-07-14 Drill Stem Test Performed
1958-07-17 Drill Stem Test Performed
1958-07-19 Drill Stem Test Performed
1958-07-20 Drill Stem Test Performed
1958-07-21 Drill Stem Test Performed
1958-07-22 Drill Stem Test Performed
1958-07-23 Drill Stem Test Performed
1958-07-24 Finished Drilling
1958-07-24 Well Mode changed to Drilled and Cased
1958-07-25 Production Casing Operation Performed
1958-07-27 Perforation Treatment Performed - Bullet Perforation
1962-04-17 Perforation Treatment Performed - Jet Perforation
1962-06-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-06-03 Perforation Treatment Performed - Cement Squeeze
1962-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-06 Perforation Treatment Performed - Jet Perforation
1964-09-02 Perforation Treatment Performed - Jet Perforation
1964-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-10 Perforation Treatment Performed - Fractured
1964-09-10 Perforation Treatment Performed - Jet Perforation
1964-09-10 Perforation Treatment Performed - Nitrogen Treatment
1978-02-02 Well Log Performed
1978-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-23 Perforation Treatment Performed - Jet Perforation
1993-06-23 Plug Back Performed
1993-06-23 Well Log Performed
1993-06-25 Perforation Treatment Performed - Fractured
1993-07-06 Perforation Treatment Performed - Jet Perforation
1993-07-08 Perforation Treatment Performed - Fractured
2000-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-13 Plug Back Performed
2001-03-22 Well Log Performed
2001-04-08 Perforation Treatment Performed - Jet Perforation
2001-04-08 Well Mode changed to Drilled and Cased
2001-04-09 Perforation Treatment Performed - Fractured
2001-04-11 Perforation Treatment Performed - Jet Perforation
2002-06-16 Well Began Production
2002-06-16 Well Fluid changed to Gas
2002-06-16 Well Mode changed to Flowing
2002-09-29 Well Fluid changed to Gas
2002-09-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-07-27 Bullet Perforation 1293.60 1294.80 13
1964-09-02 Perforation 1313.70 1315.50 13
1964-09-05 Acid Treatment 1312.50 1315.50 0
1964-09-10 Perforation 1304.50 1310.60 13
1964-09-10 Nitrogen Treatment 1293.00 1310.60 0
1964-09-10 Fracture 1293.00 1310.60 0
1978-03-10 Packing Device Capped w/Cement 1295.70 1299.70 0
1993-06-23 Packing Device Capped w/Cement 1282.50 1290.50 0
1993-06-23 Perforation 1261.90 1266.70 13
1993-06-23 Perforation 1269.20 1271.00 13
1993-06-23 Perforation 1274.10 1279.60 13
1958-07-27 Bullet Perforation 1296.00 1297.80 13
1993-06-25 Fracture 1261.90 1279.60 0
1993-07-06 Perforation 1069.80 1085.70 13
1993-07-08 Fracture 1069.80 1085.70 0
2000-01-13 Packing Device Capped w/Cement 1242.30 1252.30 0
2000-01-13 Packing Device Capped w/Cement 1049.80 1059.80 0
2001-04-08 Perforation 718.00 721.00 7
2001-04-08 Perforation 707.50 710.50 7
2001-04-09 Fracture 707.50 721.00 0
2001-04-11 Perforation 649.00 652.00 7
2001-04-11 Perforation 642.00 644.00 7
1958-07-27 Bullet Perforation 1301.50 1307.60 13
2001-04-11 Perforation 632.00 634.00 7
1962-04-17 Perforation 1308.50 1310.60 0
1962-06-03 Hydra Jet Perforation 1300.90 1302.70 0
1962-06-03 Hydra Jet Perforation 1304.50 1304.50 0
1962-06-03 Cement Squeeze 1299.70 1310.60 0
1962-06-06 Perforation 1293.00 1294.80 13
1962-06-06 Acid Treatment 1293.00 1294.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4455 0.0 0.0 0.0
2003 8672 0.0 0.0 0.0
2004 8743 0.0 0.0 0.0
2005 8040 0.0 0.0 0.0
2006 8185 0.0 0.0 0.0
2007 7572 0.0 0.0 0.0
2008 7955 0.0 0.0 0.0
2009 8021 0.0 0.0 0.0
2010 8531 0.0 0.0 0.0
2011 8198 0.0 0.0 0.0
2012 8684 0.0 0.0 0.0
2013 8595 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8687 0.0 0.0 0.0
2016 8666 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8203 0.0 0.0 0.0
2019 8232 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[5]

References