X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234191310002

Well Details

Well ID: 0234191310002
Loading map...
Location: 00/10-13-023-19W4/2
Location Alias: 00/10-13-23-19 W4M
Location Alias 2: 00/10-13-023-19 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 19
Section: 13
County/Municipality: Wheatland County
Well Name: TXNE COUNTESS 10-13-23-19
Operator Name: Torxen Energy Ltd.
License Number: 0015463
License Date: 1958-06-27
License Status: Issued
Spud Date: 1958-07-04
Final Drill Date: 1958-07-24
Well Total Depth: 1346.60 m
Surface Hole Latitude: 50.959548
Surface Hole Longitude: -112.525322

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-06-27 Obtained License
1958-07-11 Drill Stem Test Performed
1958-07-14 Drill Stem Test Performed
1958-07-17 Drill Stem Test Performed
1958-07-19 Drill Stem Test Performed
1958-07-20 Drill Stem Test Performed
1958-07-21 Drill Stem Test Performed
1958-07-22 Drill Stem Test Performed
1958-07-23 Drill Stem Test Performed
1958-07-24 Finished Drilling
1958-07-25 Production Casing Operation Performed
1958-07-27 Perforation Treatment Performed - Bullet Perforation
1958-07-27 Well Mode changed to Drilled and Cased
1962-04-17 Perforation Treatment Performed - Jet Perforation
1962-06-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-06-03 Perforation Treatment Performed - Cement Squeeze
1962-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-06 Perforation Treatment Performed - Jet Perforation
1964-09-02 Perforation Treatment Performed - Jet Perforation
1964-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-10 Perforation Treatment Performed - Fractured
1964-09-10 Perforation Treatment Performed - Jet Perforation
1964-09-10 Perforation Treatment Performed - Nitrogen Treatment
1978-02-02 Well Log Performed
1978-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-03-10 Well Mode changed to Drilled and Cased
1986-10-09 Well Began Production
1986-10-09 Well Fluid changed to Crude Oil
1986-10-09 Well Mode changed to Flowing
1987-02-23 Well Fluid changed to Crude Oil
1987-02-23 Well Mode changed to Pumping
1993-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-23 Perforation Treatment Performed - Jet Perforation
1993-06-23 Plug Back Performed
1993-06-23 Well Fluid changed to Crude Oil
1993-06-23 Well Log Performed
1993-06-23 Well Mode changed to Abandoned Zone
1993-06-25 Perforation Treatment Performed - Fractured
1993-07-06 Perforation Treatment Performed - Jet Perforation
1993-07-08 Perforation Treatment Performed - Fractured
2000-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-13 Plug Back Performed
2001-03-22 Well Log Performed
2001-04-08 Perforation Treatment Performed - Jet Perforation
2001-04-09 Perforation Treatment Performed - Fractured
2001-04-11 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-07-27 Bullet Perforation 1293.60 1294.80 13
1964-09-02 Perforation 1313.70 1315.50 13
1964-09-05 Acid Treatment 1312.50 1315.50 0
1964-09-10 Perforation 1304.50 1310.60 13
1964-09-10 Nitrogen Treatment 1293.00 1310.60 0
1964-09-10 Fracture 1293.00 1310.60 0
1978-03-10 Packing Device Capped w/Cement 1295.70 1299.70 0
1993-06-23 Packing Device Capped w/Cement 1282.50 1290.50 0
1993-06-23 Perforation 1261.90 1266.70 13
1993-06-23 Perforation 1269.20 1271.00 13
1993-06-23 Perforation 1274.10 1279.60 13
1958-07-27 Bullet Perforation 1296.00 1297.80 13
1993-06-25 Fracture 1261.90 1279.60 0
1993-07-06 Perforation 1069.80 1085.70 13
1993-07-08 Fracture 1069.80 1085.70 0
2000-01-13 Packing Device Capped w/Cement 1242.30 1252.30 0
2000-01-13 Packing Device Capped w/Cement 1049.80 1059.80 0
2001-04-08 Perforation 718.00 721.00 7
2001-04-08 Perforation 707.50 710.50 7
2001-04-09 Fracture 707.50 721.00 0
2001-04-11 Perforation 649.00 652.00 7
2001-04-11 Perforation 642.00 644.00 7
1958-07-27 Bullet Perforation 1301.50 1307.60 13
2001-04-11 Perforation 632.00 634.00 7
1962-04-17 Perforation 1308.50 1310.60 0
1962-06-03 Hydra Jet Perforation 1300.90 1302.70 0
1962-06-03 Hydra Jet Perforation 1304.50 1304.50 0
1962-06-03 Cement Squeeze 1299.70 1310.60 0
1962-06-06 Perforation 1293.00 1294.80 13
1962-06-06 Acid Treatment 1293.00 1294.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 253 0.0 0.0 0.0
1987 5403 0.0 0.0 0.0
1988 6174 0.0 0.0 0.0
1989 5827 0.0 0.0 0.0
1990 5097 0.0 0.0 0.0
1991 8218 0.0 0.0 0.0
1992 5924 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References