X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234162506000

Well Details

Well ID: 0234162506000
Loading map...
Location: 00/06-25-023-16W4/0
Location Alias: 00/06-25-23-16 W4M
Location Alias 2: 00/06-25-023-16 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 16
Section: 25
County/Municipality: County of Newell
Well Name: EMBER WINTERH 6-25-23-16
Operator Name: Ember Resources Inc.
License Number: 0049228
License Date: 1974-03-04
License Status: RecCertified
Spud Date: 1974-03-07
Final Drill Date: 1974-03-13
Well Total Depth: 1153.70 m
Surface Hole Latitude: 50.983463
Surface Hole Longitude: -112.112965

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-03-04 Obtained License
1974-03-13 Finished Drilling
1974-03-14 Drill Stem Test Performed
1974-03-15 Drill Stem Test Performed
1974-03-16 Production Casing Operation Performed
1974-03-27 Perforation Treatment Performed - Jet Perforation
1974-04-03 Well Mode changed to Drilled and Cased
1976-01-03 Well Began Production
1976-01-03 Well Fluid changed to Gas
1976-01-03 Well Mode changed to Flowing
1985-04-15 Well Fluid changed to Gas
1985-04-15 Well Mode changed to Suspended
1994-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-09 Perforation Treatment Performed - Jet Perforation
1994-01-09 Plug Back Performed
1994-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-10 Perforation Treatment Performed - Cement Plug
1994-01-10 Perforation Treatment Performed - Remedial Casing
1994-01-10 Well Fluid changed to Gas
1994-01-10 Well Mode changed to Abandoned
1994-09-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-03-27 Perforation 1101.50 1103.40 7
1994-01-09 Packing Device Capped w/Cement 1086.00 1094.00 0
1994-01-09 Perforation 220.00 221.00 13
1994-01-10 Acid Treatment 220.00 221.00 0
1994-01-10 Remedial Casing Cementing 220.00 221.00 0
1994-01-10 Cement Plug 160.00 221.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6984 0.0 0.0 0.0
1977 5428 0.0 0.0 0.0
1978 6032 0.0 0.0 0.0
1979 6030 0.0 0.0 0.0
1980 4431 0.0 0.0 0.0
1981 4931 0.0 0.0 0.0
1982 3773 0.0 0.0 0.0
1983 3001 0.0 0.0 0.0
1984 127 0.0 0.0 0.0

For data sources see[5]

References