X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234092610003

Well Details

Well ID: 0234092610003
Loading map...
Location: 00/10-26-023-09W4/3
Location Alias: 00/10-26-23-09 W4M
Location Alias 2: 00/10-26-023-09 W4/03
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 09
Section: 26
County/Municipality: Special Areas No. 3
Well Name: EOG CESS 10-26-23-9
Operator Name: Canadian Natural Resources Limited
License Number: 0258294
License Date: 2001-08-07
License Status: RecCertified
Spud Date: 2001-08-25
Final Drill Date: 2001-08-27
Well Total Depth: 965.00 m
Surface Hole Latitude: 50.989873
Surface Hole Longitude: -111.155745

For data sources see[1][2]

Well History

Date Event
2001-08-07 Obtained License
2001-08-25 Surface Casing Operation Performed
2001-08-27 Finished Drilling
2001-08-27 Production Casing Operation Performed
2001-08-27 Rig Released
2001-08-27 Well Log Performed
2001-08-27 Well Mode changed to Drilled and Cased
2001-09-02 Perforation Treatment Performed - Jet Perforation
2001-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-04 Perforation Treatment Performed - Jet Perforation
2001-10-04 Plug Back Performed
2001-10-16 Perforation Treatment Performed - Fractured
2007-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-30 Perforation Treatment Performed - Jet Perforation
2007-01-30 Plug Back Performed
2008-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-21 Plug Back Performed
2008-09-21 Well Mode changed to Abandoned Zone
2008-09-27 Well Abandoned
2008-09-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-02 Perforation 941.00 945.00 17
2007-01-30 Perforation 715.00 717.00 3
2008-09-21 Packing Device Capped w/Cement 694.00 702.50 0
2001-09-02 Perforation 936.50 937.50 17
2001-10-04 Packing Device Capped w/Cement 927.00 935.00 0
2001-10-04 Perforation 871.00 875.00 17
2001-10-04 Perforation 878.00 880.00 17
2001-10-04 Perforation 883.00 886.00 17
2001-10-16 Fracture 871.00 886.00 0
2007-01-30 Packing Device Capped w/Cement 857.00 865.40 0
2007-01-30 Perforation 707.00 709.00 3

For data sources see[4]



References