X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234080407000

Well Details

Well ID: 0234080407000
Loading map...
Location: 00/07-04-023-08W4/0
Location Alias: 00/07-04-23-08 W4M
Location Alias 2: 00/07-04-023-08 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 08
Section: 04
County/Municipality: Special Areas No. 3
Well Name: EOG ATL-BUFF 7-4-23-8
Operator Name: Canadian Natural Resources Limited
License Number: 0142517
License Date: 1990-01-05
License Status: Abandoned
Spud Date: 1990-01-10
Final Drill Date: 1990-01-16
Well Total Depth: 881.00 m
Surface Hole Latitude: 50.925795
Surface Hole Longitude: -111.061242

For data sources see[1][2]

Well History

Date Event
1990-01-05 Obtained License
1990-01-14 Surface Casing Operation Performed
1990-01-16 Finished Drilling
1990-01-16 Well Log Performed
1990-01-17 Drill Stem Test Performed
1990-01-17 Production Casing Operation Performed
1990-01-18 Rig Released
1990-01-18 Well Mode changed to Drilled and Cased
1990-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-20 Perforation Treatment Performed - Jet Perforation
1990-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-01-22 Perforation Treatment Performed - Jet Perforation
1990-01-22 Plug Back Performed
2001-10-12 Well Began Production
2001-10-12 Well Fluid changed to Gas
2001-10-12 Well Mode changed to Flowing
2003-05-01 Well Fluid changed to Gas
2003-05-01 Well Mode changed to Suspended
2008-02-07 Well Log Performed
2008-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-14 Perforation Treatment Performed - Jet Perforation
2008-02-14 Plug Back Performed
2008-02-14 Well Fluid changed to Gas
2008-02-14 Well Mode changed to Abandoned Zone
2008-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-15 Perforation Treatment Performed - Jet Perforation
2008-02-15 Plug Back Performed
2008-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-26 Plug Back Performed
2008-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-05 Plug Back Performed
2009-09-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-20 Perforation 845.00 848.00 13
2008-02-15 Perforation 278.00 279.00 3
2008-02-15 Perforation 307.00 308.00 3
2008-02-15 Perforation 374.00 375.00 3
2008-11-26 Packing Device Capped w/Cement 361.00 370.00 0
2008-12-05 Packing Device Capped w/Cement 267.00 275.40 0
1990-01-20 Perforation 851.00 852.00 13
1990-01-20 Acid Treatment 845.00 852.00 0
1990-01-22 Packing Device Capped w/Cement 835.00 843.00 0
1990-01-22 Perforation 651.00 652.00 13
2008-02-14 Packing Device Capped w/Cement 643.00 646.40 0
2008-02-14 Perforation 589.00 590.00 5
2008-02-14 Perforation 596.50 597.50 5
2008-02-15 Packing Device Capped w/Cement 581.00 584.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1871 0.0 0.0 0.0
2002 1204 0.0 0.0 0.0

For data sources see[5]

References