X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234080112003

Well Details

Well ID: 0234080112003
Loading map...
Location: 00/12-01-023-08W4/3
Location Alias: 00/12-01-23-08 W4M
Location Alias 2: 00/12-01-023-08 W4/03
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 08
Section: 01
County/Municipality: Special Areas No. 3
Well Name: EOG ATL-BUFF 12-1-23-8
Operator Name: Canadian Natural Resources Limited
License Number: 0142349
License Date: 1989-12-27
License Status: Suspension
Spud Date: 1989-12-29
Final Drill Date: 1990-01-08
Well Total Depth: 830.00 m
Surface Hole Latitude: 50.931321
Surface Hole Longitude: -110.999285

For data sources see[1][2]

Well History

Date Event
1989-12-27 Obtained License
1990-01-04 Surface Casing Operation Performed
1990-01-07 Kick Occurred
1990-01-08 Finished Drilling
1990-01-08 Well Mode changed to Drilled and Cased
1990-01-09 Kick Occurred
1990-01-09 Well Log Performed
1990-01-10 Drill Stem Test Performed
1990-01-11 Kick Occurred
1990-01-11 Production Casing Operation Performed
1990-01-11 Rig Released
1990-02-15 Perforation Treatment Performed - Jet Perforation
1993-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-19 Perforation Treatment Performed - Jet Perforation
1993-02-19 Plug Back Performed
1993-02-19 Well Log Performed
1993-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-25 Perforation Treatment Performed - Cement Squeeze
2001-05-25 Plug Back Performed
2001-05-26 Perforation Treatment Performed - Jet Perforation
2007-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-20 Perforation Treatment Performed - Jet Perforation
2007-07-20 Plug Back Performed
2007-07-20 Well Log Performed
2007-08-04 Perforation Treatment Performed - Fractured
2008-01-16 Well Began Production
2008-01-16 Well Fluid changed to Gas
2008-01-16 Well Mode changed to Flowing
2017-02-28 Well Fluid changed to Gas
2017-02-28 Well Mode changed to Suspended
2019-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-28 Plug Back Performed
2019-10-28 Well Fluid changed to Gas
2019-10-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-15 Perforation 731.30 735.80 13
2007-08-04 Fracture 572.00 573.00 0
2007-08-04 Fracture 576.00 577.00 0
2019-09-27 Packing Device Capped w/Cement 600.00 608.00 0
2019-10-28 Packing Device Capped w/Cement 552.00 560.00 0
1993-02-19 Packing Device Capped w/Cement 715.00 723.00 0
1993-02-19 Perforation 635.00 636.00 13
1993-02-20 Acid Treatment 635.00 636.00 0
2001-05-25 Cement Squeeze 635.00 636.00 0
2001-05-26 Perforation 731.30 735.80 13
2007-07-20 Packing Device Capped w/Cement 712.00 720.50 0
2007-07-20 Perforation 572.00 573.00 5
2007-07-20 Perforation 576.00 577.00 5

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 7481 0.0 0.0 0.0
2009 5920 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 6124 0.0 0.0 0.0
2012 6569 0.0 0.0 0.0
2015 4704 0.0 0.0 0.0
2016 2688 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-01-07 Kick 599.00 599.00
1990-01-09 Kick 830.00 830.00
1990-01-11 Kick 830.00 830.00
2019-10-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References