X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234060106020

Well Details

Well ID: 0234060106020
Loading map...
Location: 02/06-01-023-06W4/0
Location Alias: 02/06-01-23-06 W4M
Location Alias 2: 02/06-01-023-06 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 06
Section: 01
County/Municipality: Special Areas No. 3
Well Name: CITY OF MEDH ATL-BUFF 6-1-23-6
Operator Name: City Of Medicine Hat
License Number: 0360131
License Date: 2006-07-13
License Status: RecCertified
Spud Date: 2006-10-11
Final Drill Date: 2006-10-12
Well Total Depth: 533.00 m
Surface Hole Latitude: 50.927677
Surface Hole Longitude: -110.714943

For data sources see[1][2]

Well History

Date Event
2006-07-13 Obtained License
2006-10-11 Surface Casing Operation Performed
2006-10-12 Finished Drilling
2006-10-12 Production Casing Operation Performed
2006-10-12 Rig Released
2006-10-12 Well Mode changed to Drilled and Cased
2006-11-07 Well Log Performed
2006-11-11 Perforation Treatment Performed - Jet Perforation
2006-11-15 Perforation Treatment Performed - Fractured
2006-11-18 Perforation Treatment Performed - Jet Perforation
2006-11-19 Perforation Treatment Performed - Fractured
2006-11-23 Perforation Treatment Performed - Jet Perforation
2006-11-24 Perforation Treatment Performed - Fractured
2007-01-17 Well Began Production
2007-01-17 Well Fluid changed to Gas
2007-01-17 Well Mode changed to Flowing
2014-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-16 Plug Back Performed
2014-09-16 Well Fluid changed to Gas
2014-09-16 Well Mode changed to Abandoned Zone
2014-10-06 Well Abandoned
2014-10-06 Well Fluid changed to Gas
2014-10-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-11-11 Perforation 471.00 475.00 13
2006-11-19 Fracture 409.00 411.00 0
2006-11-19 Fracture 404.00 405.00 0
2006-11-19 Fracture 401.00 403.00 0
2006-11-23 Perforation 390.50 393.50 7
2006-11-23 Perforation 388.50 389.50 7
2006-11-23 Perforation 378.50 381.50 7
2006-11-24 Fracture 390.50 393.50 0
2006-11-24 Fracture 388.50 389.50 0
2006-11-24 Fracture 378.50 381.50 0
2014-09-16 Packing Device Capped w/Cement 362.00 370.00 0
2006-11-15 Fracture 471.00 475.00 0
2006-11-18 Perforation 420.50 421.50 7
2006-11-18 Perforation 417.00 419.00 7
2006-11-18 Perforation 409.00 411.00 7
2006-11-18 Perforation 404.00 405.00 7
2006-11-18 Perforation 401.00 403.00 7
2006-11-19 Fracture 420.50 421.50 0
2006-11-19 Fracture 417.00 419.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 8279 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 8707 0.0 0.0 0.0
2010 8708 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 7733 0.0 0.0 0.0
2013 6231 0.0 0.0 0.0
2014 2159 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References