X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0225062707000

Well Details

Well ID: 0225062707000
Loading map...
Location: 00/07-27-022-06W5/0
Location Alias: 00/07-27-22-06 W5M
Location Alias 2: 00/07-27-022-06 W5/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 5
Range: 06
Section: 27
County/Municipality: Kananaskis Improvement District
Well Name: SHELL HOME MOOSE 7-27-22-6
Operator Name: Shell Canada Limited
License Number: 0070342
License Date: 1978-06-23
License Status: Issued
Spud Date: 1978-06-28
Final Drill Date: 1978-11-01
Well Total Depth: 4775.00 m
Surface Hole Latitude: 50.897628
Surface Hole Longitude: -114.750555

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-23 Obtained License
1978-07-17 Lost Circulation Occurred
1978-11-01 Finished Drilling
1978-11-07 Production Casing Operation Performed
1979-01-07 Perforation Treatment Performed - Jet Perforation
1979-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-20 Perforation Treatment Performed - Fractured
1979-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-01-25 Perforation Treatment Performed - Jet Perforation
1979-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-29 Perforation Treatment Performed - Fractured
1979-02-12 Well Mode changed to Drilled and Cased
1986-01-01 Well Began Production
1986-01-01 Well Fluid changed to Gas
1986-01-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-07 Perforation 2833.00 2850.00 7
1979-01-25 Perforation 2548.00 2588.00 1
1979-01-25 Perforation 2591.00 2620.00 3
1979-01-27 Acid Treatment 2522.00 2620.00 0
1979-01-29 Fracture 2522.00 2620.00 0
1979-01-07 Perforation 2816.00 2829.00 7
1979-01-08 Acid Treatment 2816.00 2850.00 0
1979-01-20 Fracture 2816.00 2850.00 0
1979-01-25 Packing Device Capped w/Cement 2797.00 2805.00 0
1979-01-25 Perforation 2522.00 2526.00 7
1979-01-25 Perforation 2531.00 2536.00 7
1979-01-25 Perforation 2542.00 2544.00 7
1979-01-25 Perforation 2547.00 2576.00 4

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4736 0.0 0.0 0.0
1987 4809 0.0 0.0 0.0
1988 8048 0.0 0.0 0.0
1989 7583 0.0 0.0 0.0
1990 7945 0.0 0.0 0.0
1991 6802 0.0 0.0 0.0
1992 7169 0.0 0.0 0.0
1993 8314 0.0 0.0 0.0
1994 8345 0.0 0.0 0.0
1995 8633 0.0 0.0 0.0
1996 8091 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8219 0.0 0.0 0.0
1999 8259 0.0 0.0 0.0
2000 8526 0.0 0.0 0.0
2001 7698 0.0 0.0 0.0
2002 8705 0.0 0.0 0.0
2003 8257 0.0 0.0 0.0
2004 6919 0.0 0.0 0.0
2005 8397 0.0 0.0 0.0
2006 8541 0.0 0.0 0.0
2007 7765 0.0 0.0 0.0
2008 7972 0.0 0.0 0.0
2009 7770 0.0 0.0 0.0
2010 8649 0.0 0.0 0.0
2011 8287 0.0 0.0 0.0
2012 8567 0.0 0.0 0.0
2013 7569 0.0 0.0 0.0
2014 7749 0.0 0.0 0.0
2015 8596 0.0 0.0 0.0
2016 8544 0.0 0.0 0.0
2017 7387 0.0 0.0 0.0
2018 7715 0.0 0.0 0.0
2019 8498 0.0 0.0 0.0
2020 1895 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-17 Lost Circulation 390.00 689.00

For data sources see[6]

References