X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0225010816000

Well Details

Well ID: 0225010816000
Loading map...
Location: 00/16-08-022-01W5/0
Location Alias: 00/16-08-22-01 W5M
Location Alias 2: 00/16-08-022-01 W5/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 5
Range: 01
Section: 08
County/Municipality: Foothills County
Well Name: HUDSON'S BAY TWIN DOME NO. 1
Operator Name: BP Canada Energy Group ULC
License Number: 0010652
License Date: 1955-12-16
License Status: RecExempt
Spud Date: 1955-12-31
Final Drill Date: 1956-05-31
Well Total Depth: 2906.90 m
Surface Hole Latitude: 50.861203
Surface Hole Longitude: -114.096747

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-12-16 Obtained License
1956-02-27 Drill Stem Test Performed
1956-03-30 Drill Stem Test Performed
1956-04-01 Drill Stem Test Performed
1956-04-04 Drill Stem Test Performed
1956-04-07 Drill Stem Test Performed
1956-04-11 Drill Stem Test Performed
1956-05-23 Drill Stem Test Performed
1956-05-25 Drill Stem Test Performed
1956-05-28 Drill Stem Test Performed
1956-05-31 Finished Drilling
1956-06-01 Production Casing Operation Performed
1956-06-02 Perforation Treatment Performed - Bullet Perforation
1956-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-06-06 Perforation Treatment Performed - Cement Squeeze
1956-12-28 Well Mode changed to Drilled and Cased
1957-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-06-07 Perforation Treatment Performed - Bullet Perforation
1957-06-08 Perforation Treatment Performed - Acid Wash - No Pressure
1957-06-10 Perforation Treatment Performed - Acid Wash - No Pressure
1959-07-12 Perforation Treatment Performed - Acid Wash - No Pressure
1959-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1959-07-19 Well Fluid changed to Crude Oil
1959-07-19 Well Mode changed to Potential
1959-07-20 Well Abandoned
1959-07-20 Well Fluid changed to Crude Oil
1959-07-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-06-02 Bullet Perforation 2868.20 2874.30 20
1956-06-04 Acid Treatment 2868.20 2874.30 0
1956-06-06 Cement Squeeze 2868.20 2874.30 0
1957-06-06 Packing Device Capped w/Cement 2499.40 2499.40 0
1957-06-07 Bullet Perforation 2388.40 2397.60 16
1957-06-08 Acid Wash 2388.40 2397.60 0
1957-06-10 Acid Wash 2388.40 2397.60 0
1959-07-12 Acid Wash 2388.40 2397.60 0
1959-07-15 Packing Device Capped w/Cement 2380.50 2380.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References