X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224263203002

Well Details

Well ID: 0224263203002
Loading map...
Location: 00/03-32-022-26W4/2
Location Alias: 00/03-32-22-26 W4M
Location Alias 2: 00/03-32-022-26 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 26
Section: 32
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-32-22-26
Operator Name: Ember Resources Inc.
License Number: 0421272
License Date: 2010-06-18
License Status: Issued
Spud Date: 2010-11-25
Final Drill Date: 2010-11-26
Well Total Depth: 1227.00 m
Surface Hole Latitude: 50.912212
Surface Hole Longitude: -113.581614

For data sources see[1][2]

Well History

Date Event
2010-06-18 Obtained License
2010-11-25 Direction Drilling Operation Performed - Deviate
2010-11-25 Surface Casing Operation Performed
2010-11-26 Finished Drilling
2010-11-26 Well Mode changed to Drilled and Cased
2010-11-27 Production Casing Operation Performed
2010-11-27 Rig Released
2010-11-30 Well Log Performed
2010-12-14 Perforation Treatment Performed - Jet Perforation
2011-01-05 Perforation Treatment Performed - Fractured
2011-01-19 Perforation Treatment Performed - Jet Perforation
2011-02-04 Perforation Treatment Performed - Fractured
2011-02-12 Well Began Production
2011-02-12 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-12 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-25 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-14 Perforation 898.50 900.50 13
2011-01-19 Perforation 631.50 632.00 13
2011-01-19 Perforation 424.40 424.90 13
2011-01-19 Perforation 436.50 437.50 13
2011-01-19 Perforation 373.50 374.00 13
2011-01-19 Perforation 420.40 420.90 13
2011-01-19 Perforation 556.00 557.00 13
2011-01-19 Perforation 567.00 567.50 13
2011-01-19 Perforation 487.20 487.70 13
2011-01-19 Perforation 541.40 541.90 13
2011-01-19 Perforation 680.00 681.00 13
2011-01-05 Fracture 898.50 900.50 0
2011-01-19 Perforation 596.00 598.00 13
2011-01-19 Perforation 658.00 660.00 13
2011-01-19 Perforation 299.00 301.00 13
2011-01-19 Perforation 477.00 479.00 13
2011-01-19 Perforation 1022.00 1024.00 13
2011-01-19 Perforation 1031.00 1032.50 13
2011-01-19 Perforation 857.50 859.50 13
2011-01-19 Perforation 877.50 879.50 13
2011-01-19 Perforation 742.60 744.60 13
2011-01-19 Perforation 747.40 748.40 13
2011-01-19 Perforation 588.20 589.20 13
2011-01-19 Perforation 707.00 708.00 13
2011-01-19 Perforation 726.70 727.20 13
2011-01-19 Perforation 220.00 222.00 13
2011-01-19 Perforation 268.00 270.00 13
2011-01-19 Perforation 821.40 821.90 13
2011-02-04 Fracture 373.50 821.90 0
2011-02-04 Fracture 268.00 1032.50 0
2011-01-19 Perforation 590.20 590.70 13
2011-01-19 Perforation 571.70 572.20 13
2011-01-19 Perforation 582.90 584.90 13
2011-01-19 Perforation 647.50 649.50 13
2011-01-19 Perforation 655.10 656.10 13
2011-01-19 Perforation 618.40 618.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7750 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 8722 0.0 0.0 0.0
2015 8745 0.0 0.0 0.0
2016 8718 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8693 0.0 0.0 0.0
2019 8716 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

References