X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224261316000

Well Details

Well ID: 0224261316000
Loading map...
Location: 00/16-13-022-26W4/0
Location Alias: 00/16-13-22-26 W4M
Location Alias 2: 00/16-13-022-26 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 26
Section: 13
County/Municipality: Wheatland County
Well Name: ANTERRA ENTICE 16-13-22-26
Operator Name: Anterra Energy Inc.
License Number: 0142926
License Date: 1990-01-24
License Status: Abandoned
Spud Date: 1990-02-02
Final Drill Date: 1990-02-14
Well Total Depth: 1855.00 m
Surface Hole Latitude: 50.876531
Surface Hole Longitude: -113.468327

For data sources see[1][2]

Well History

Date Event
1990-01-24 Obtained License
1990-02-03 Surface Casing Operation Performed
1990-02-14 Finished Drilling
1990-02-14 Well Mode changed to Drilled and Cased
1990-02-15 Well Log Performed
1990-02-16 Production Casing Operation Performed
1990-02-17 Rig Released
1990-02-20 Well Log Performed
1990-02-22 Perforation Treatment Performed - Jet Perforation
1990-02-22 Well Log Performed
1990-03-16 Well Began Production
1990-03-16 Well Fluid changed to Crude Oil
1990-03-16 Well Mode changed to Flowing
1990-05-30 Perforation Treatment Performed - Jet Perforation
1990-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-04 Plug Back Performed
1990-06-05 Perforation Treatment Performed - Jet Perforation
1990-06-06 Perforation Treatment Performed - Jet Perforation
1990-07-24 Perforation Treatment Performed - Jet Perforation
1990-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-13 Well Began Injection
1990-09-13 Well Fluid changed to Water
1990-09-13 Well Type changed to Injection
2011-08-01 Well Fluid changed to Water
2011-08-01 Well Mode changed to Suspended
2011-08-01 Well Type changed to Injection
2018-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-11 Perforation Treatment Performed - Cement Squeeze
2018-12-11 Perforation Treatment Performed - Jet Perforation
2018-12-11 Plug Back Performed
2018-12-11 Well Fluid changed to Water
2018-12-11 Well Log Performed
2018-12-11 Well Mode changed to Abandoned Zone
2018-12-11 Well Type changed to Injection
2018-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-12 Plug Back Performed
2019-05-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-22 Perforation 1821.50 1822.50 14
2018-12-11 Packing Device Capped w/Cement 1502.00 1510.00 0
2018-12-11 Perforation 497.00 498.00 17
2018-12-11 Cement Squeeze 497.00 498.00 0
2018-12-12 Packing Device Capped w/Cement 480.00 518.00 0
1990-05-30 Perforation 1827.00 1829.00 13
1990-06-04 Packing Device Capped w/Cement 1814.00 1822.00 0
1990-06-05 Perforation 1519.50 1521.00 13
1990-06-06 Perforation 1519.50 1521.00 13
1990-07-24 Perforation 1826.00 1836.00 14
1990-08-22 Acid Treatment 1821.50 1836.00 0
1990-08-23 Acid Treatment 1821.50 1836.00 0
2018-12-11 Packing Device Capped w/Cement 1803.00 1811.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 340 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References