X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224252604022

Well Details

Well ID: 0224252604022
Loading map...
Location: 02/04-26-022-25W4/2
Location Alias: 02/04-26-22-25 W4M
Location Alias 2: 02/04-26-022-25 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 25
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 4-26-22-25
Operator Name: Ember Resources Inc.
License Number: 0412591
License Date: 2009-09-25
License Status: RecCertified
Spud Date: 2010-01-04
Final Drill Date: 2010-01-30
Well Total Depth: 888.00 m
Surface Hole Latitude: 50.894494
Surface Hole Longitude: -113.369356

For data sources see[1][2]

Well History

Date Event
2009-09-25 Obtained License
2010-01-04 Lost Circulation Occurred
2010-01-05 Surface Casing Operation Performed
2010-01-30 Finished Drilling
2010-01-30 Production Casing Operation Performed
2010-01-30 Rig Released
2010-01-30 Well Mode changed to Drilled and Cased
2010-02-02 Well Log Performed
2010-02-10 Perforation Treatment Performed - Jet Perforation
2010-02-15 Perforation Treatment Performed - Fractured
2010-03-02 Well Structure changed to Commingled
2010-05-11 Well Log Performed
2014-11-16 Perforation Treatment Performed - Cement Plug
2014-11-16 Plug Back Performed
2014-11-16 Well Mode changed to Abandoned Zone
2014-11-16 Well Structure changed to Commingled
2014-12-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-10 Perforation 402.00 403.00 13
2010-02-10 Perforation 381.20 381.70 13
2010-02-10 Perforation 369.10 369.60 13
2010-02-10 Perforation 359.20 361.20 13
2010-02-10 Perforation 626.50 628.50 13
2010-02-10 Perforation 595.00 598.00 13
2010-02-10 Perforation 408.00 410.00 13
2010-02-10 Perforation 864.00 865.00 13
2010-02-10 Perforation 846.00 849.00 13
2010-02-10 Perforation 721.50 724.50 13
2010-02-10 Perforation 565.10 565.60 13
2010-02-10 Perforation 397.60 398.10 13
2010-02-10 Perforation 555.30 555.80 13
2010-02-10 Perforation 551.60 552.10 13
2010-02-10 Perforation 391.20 392.20 13
2010-02-10 Perforation 338.00 341.00 13
2010-02-15 Fracture 223.80 565.60 0
2010-02-15 Fracture 338.00 865.00 0
2014-11-16 Cement Plug 139.00 882.60 0
2010-02-10 Perforation 384.50 385.00 13
2010-02-10 Perforation 549.80 550.30 13
2010-02-10 Perforation 484.20 484.70 13
2010-02-10 Perforation 411.10 411.60 13
2010-02-10 Perforation 354.70 356.70 13
2010-02-10 Perforation 312.50 313.00 13
2010-02-10 Perforation 223.80 224.30 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-04 Lost Circulation 50.00 55.00
2014-11-16 No Incident Encountered 0.00 0.00

For data sources see[5]

References